Class of '62 Center for Theatre and Dance - 2005

2005 Total Project Cost: $52,194,310
1998 Herbert Allen donation – $20,000,000
1998-99 Theatre Design Consultant: Robert Davis, Inc.
1999 Site Analysis: Sasaki Associates
1999 Architect: William Rawn Associates
1999 General Contractor: Barr & Barr
2001 American Legion – $791,205
Architect: Hill Architects
General Contractor: Waldron
2001 Design and engineering fees – $2,000,000
2002 Site work and construction – $46,400,000
2003 High voltage distribution system expansion – $350,000
General Contractor: Barr & Barr
2004 Construction Budget Increase – $1,500,000