1791-93
|
West College (West Township original name of Williamstown) |
Remodeled 1855 – central door out and north and south doors cut in. Remodeled 1904 and north door sealed up. | |
1801
|
President’s House (Samuel Sloan House) |
Front part only; woodwork imported from Boston | |
1828
|
Griffin Hall (Edward Dorr Griffin) |
Originally had double entrance and stood near Main St. Built by President Griffin at a cost of $6,000; served as chapel until 1859 (when Goodrich Hall was built), library built 1847, and lecture room; moved to northeast in 1904 and remodeled. The building was originally called “the brick chapel,” and was named Griffin Hall in 1859. | |
Architect: Harding and Seaver | |
1837
|
Hopkins Observatory (Albert Hopkins) |
Built by Professor Albert Hopkins and students near East College. Moved in the 1850’s to the south end of the Berkshire Quad. In 1962, it was moved to the north end of the Berkshire Quad.Cost: $2,075 | |
1842
|
East College |
Rebuilt – the original building of 1798 burned in 1841. In 1907 larger doorways added. | |
Designed by J.S. Oakman ’99. | |
1842
|
South College (Fayerweather Hall) |
Gold Coast addition to south in 1905 and the building renamed Fayerweather. | |
Architect: Allen & Collens | |
1846
|
Lawrence Hall (Amos Lawrence) |
Octagonal Library, cost $7,000. | |
Architect: Thomas Tefft, (Providence). | |
East and west wings 1890; additions at rear in 1915, 1926, 1938. Became Art Museum in 1926. | |
1859
|
Goodrich Hall (John Zaccheus Goodrich) |
Chapel and Alumni Hall – shift to stone (local dolomite) and to Gothic. | |
Architect: Gervase Wheeler | |
1882
|
Morgan Hall (Edwin Denison Morgan) |
First campus building to be connected to a College heating plant. It was the first dorm to have plumbing, including indoor bathrooms. | |
Architect: J.C. Cady and Co. (N.Y.C.) | |
1886
|
Lasell Gymnasium (Edward Lasell ’28 and Josiah Lasell ’84) |
Architect: J.C. Cady and Co. (N.Y.C.) | |
1893
|
Thompson Scientific Laboratories |
Architect: Francis Allen (Allen & Collens) | |
(designed all three and rebuilt the chemistry building). | |
Chemistry Laboratory burned 1915, rebuilt 1916; enlarged and modernized 1941. | |
1897
|
Hopkins Hall (Mark Hopkins) |
Based on Romanesque style of Henry Hobson Richardson; | |
memorial to Mark Hopkins (d. 1887). | |
Cost: $87,000 | |
Architect: Francis Allen and Kenway (Boston) | |
1899
|
Jesup Hall (Morgan Ketchum Jesup) |
Campus center, orange brick, painted yellow | |
Architect: George Tilden | |
Remodeled 1908 by John S. Oakman ’99 | |
1902 | College Garage |
1905
|
Berkshire Hall (renamed Ebenezer Fitch Hall in 1971) |
Architect: Francis R. Allen (Allen and Collens) | |
1905
|
Goodrich Hall |
Remodeled and named Goodrich. | |
1905
|
Thompson Memorial Chapel (Frederick Ferris Thompson ’56) |
Compare the Gothic of Goodrich Hall | |
Architect: Francis R. Allen (Allen and Collens) | |
Windows: The Church Decorating Company (N.Y.) | |
1905
|
Wood House (Hamilton B. Wood ’10) |
Architect: John B. Snook, Inc. (New York) | |
1908
|
Currier Hall (Lura Ormsbee Currier) |
Architect: Robins and J.S Oakman ’99 | |
1908
|
Clark Hall (Edward Clark ’31) (Geology) |
Old Clark Hall (wooden) pulled down 1886 | |
Architect: Frank Wallis and William J. Rogers | |
1909
|
Spencer House (Philip Spencer) |
Architect: James Purdon | |
1911
|
Thompson Hall Infirmary (Mary Clark Thompson) |
Architect: Allen & Collens | |
1911
|
Williams Hall (Colonel Ephraim Williams) |
Architect: (Ralph Adams) Cram, Goodhue and Ferguson | |
1911/12
|
Chapin Hall (Alfred Clark Chapin) (formerly Grace Hall named after Mrs. Chapin) |
Cost: $259,313; cost of organ $45,800 | |
Architect: (Ralph Adams) Cram, Goodhue and Ferguson | |
1922
|
Stetson Hall Library (Francis Lynde Stetson ’67) |
Cost: $750,000 | |
Architect: (Ralph Adams) Cram and Ferguson | |
1923
|
Sage Hall (Mrs. Russell Sage) |
Architect: (Ralph Adams) Cram and Ferguson | |
Gate between Williams and Sage erected 1936 | |
1925
|
Mears House (Brainerd Mears) |
Architect: (Ralph Adams) Cram and Ferguson | |
1925
|
Tyler House (Lt. John Cowperthwaite Tyler ’15) |
Architect: Andrews, Jones, Briscoe & Whitmore | |
1926
|
Cole Field House |
Architect: Densmore, LeClare and Robbins (Boston) | |
1928
|
Lasell Extension South of Gymnasium |
Architect: Densmore, LeClare and Robbins (Boston) | |
1928
|
Lehman Hall (Herbert Lehman ’99) |
Architect: (Ralph Adams) Cram and Ferguson | |
1931
|
Taconic House (Fort Hoosac) |
Architect: Grosvenor S. Wright | |
1934
|
Heating Plant |
Architect: (Ralph Adams) Cram and Ferguson | |
1938
|
Faculty House/Alumni Center |
Cost: $150,000 | |
Architect: T.H. Ellett (N.Y.). | |
1938
|
Squash Courts |
Architect: Shreve, Lamb ’04 and Harmon | |
1941
|
Adams Memorial Theatre (John Quincy Adams) |
Cost: approx. $250,000 | |
Architect: Hoyle (Cram and Ferguson) | |
Tech. Advisor: Stanley McCandless (Yale School of Drama) | |
1941
|
Alumni House/The Log |
Architect: Kenneth Reynolds ’16 | |
1946
|
Faculty Housing Project (Stetson Road Apartments-12) |
Architect: Kenneth Reynolds ’16 | |
1949-51
|
Thompson Physics and Biology Laboratory |
Additions: $900,000 | |
Architect: Des Granges and Steffian | |
1951
|
Weston Field House |
Cost: $17,500 | |
Designed by: Peter P. Welanetz, P.E. | |
1952
|
Alumni House |
West College room addition: $28,000 | |
Architect: Kenneth Reynolds ’16 | |
1952
|
Griffin Hall |
Restored: $29,000 | |
Designed by: Peter P. Welanetz | |
1952
|
West College |
Rebuilt: $225,000 (Fire 1/2/51) | |
Architect: Perry, Shaw, Hepburn, Kehoe and Dean | |
1953
|
Baxter Hall (James Phinney Baxter III ’14) |
Cost: $1,500,000 | |
Architect: Perry, Shaw, Hepburn, Kehoe and Dean | |
1953
|
Heating Plant |
Addition: $300,000 | |
Architect: Lockwood Greene Co. | |
1953
|
Lansing Chapman Rink and Machinery Building (William Lansing Chapman ’10) |
Cost: $100,000Architect: Mollenburg and Betz | |
1953
|
Weston Field |
Press Box built: $1,000 | |
Designed by: Peter P. Welanetz, P.E. | |
1954
|
President’s House |
Garage: $6,000 | |
Designed by: Peter P. Welanetz, P.E. | |
1954/57
|
Currier Hall |
Restoration and Music Department: $35,000 | |
Designed by: Peter P. Welanetz, P.E. | |
1955
|
Baxter Hall – Rathskeller |
Basement of Baxter Hall: $18,250 | |
Designed by: Perry, Shaw, Hepburn, Kehoe and Dean & William C. Bryant | |
1955
|
Taconic Golf Club House |
Cost: $70,000 | |
Architect: Seymour Saltus | |
1956
|
East College |
Rebuilt: $267,000 | |
Architect: Cram and Ferguson | |
1956
|
Mather House (Benjamin F. Mather) |
Restored: $37,000 | |
Architects: William Gass and Peter P. Welanetz, P.E. | |
1956
|
Stetson Hall |
Library Addition: $450,000 | |
Architect: Cram and Ferguson | |
1957
|
Conversion of Electrical Distribution System |
Conversion from 2300 to 4140 volts: $11,800 | |
Designed by: Northern Berkshire Electric Co. | |
1957
|
Fayerweather Hall (Daniel F. Fayerweather) |
Rebuilt: $325,000 | |
Architect: Cram and Ferguson | |
1958-61
|
Thompson Chemistry Building |
Alterations: $75,000 | |
Designed by: A. B. Stanley and Peter P. Welanetz, P.E. | |
1961
|
Brooks House (Belvidere Brooks ’10) |
Architect: Daniel O’Connell & Sons | |
1961
|
Lansing Chapman Hockey Rink |
Canopy: $176,500 | |
Architect: Lockwood Greene Co. | |
1961
|
Thompson Physics Library |
Expansion: $12,000 | |
1962
|
Hopkins Observatory (Albert Hopkins) |
Moving of Observatory: $50,000 | |
1962
|
New Planetarium – Hopkins Observatory |
Cost: $25,000 | |
Designed by: Spitz Laboratories | |
1962
|
Prospect House (Prospect Mountain) |
Cost: $1,200,000 | |
Architect: Shepley, Bulfinch, Richardson and Abbott | |
1962
|
Service Building |
Cost: $200,000 | |
Architects: William Kirby and Peter P. Welanetz, P.E. | |
1962
|
Stetson Hall – Roper Center |
Addition to Stetson Library: $200,000 | |
Architect: Hoyle, Doran and Berry | |
1962
|
Taconic Golf Club |
Club House Addition: $55,000 | |
Designed by: Peter P. Welanetz, P.E. | |
1963
|
Driscoll Dining Hall (Alfred E. Driscoll ’25) |
Berkshire Quadrangle – dining/lounge building: $385,000 | |
Architect: Shepley, Bulfinch, Richardson and Abbott | |
1963
|
Fitch House (formerly Berkshire Hall) |
Restored: $180,000 | |
Architect: The Architects Collaborative | |
1964
|
Currier Hall |
Renovation: $180,000 | |
Architect: The Architects Collaborative | |
1964
|
Thompson Chemistry Laboratory |
Laboratory Remodeling: $75,000 | |
Architect: William Kirby, Jr. | |
1964-65
|
Replacement and Extension of Steam Distribution System |
Cost: $129,000 | |
Engineer: Lockwood Greene Co. | |
1964-65
|
Thompson Memorial Chapel |
Exterior major restoration | |
1965
|
Greylock Residential Houses |
Design and Construction: $2,700,000 | |
William Cullen Bryant, Franklin Carter, Washington Gladden, Mark Hopkins and Greylock Dining | |
Architect: The Architects Collaborative | |
1965
|
Karl E. Weston Language Lab (Karl Ephraim Weston ’96) |
Alteration to former Phi Delta Theta Fraternity House | |
Designed by: Ralph W. Iacuessa | |
1968
|
Bronfman Science Center (Edgar M. Bronfman ’50) |
Design and Construction : $3,750,000 | |
Architect: Benjamin Thompson & Associates, Inc. | |
1968
|
Fernald House (Orlando Marcellus Fernald) |
Addition: $6,200 | |
Designed by: Ralph W. Iacuessa | |
1969
|
Clark Hall |
Renovation: $350,000 | |
Architect: Lockwood Greene Co. | |
1969
|
Lansing Chapman Rink |
Total enclosure and connecting building: $900,000 | |
Engineer: Lockwood Greene Co. | |
1969
|
Sprinkler System |
Agard, Bascom, Brooks, Fort Hoosac, Perry, Spencer, Tyler, Wood: $160,000 | |
Engineer: Automatic Sprinkler Corp. | |
1969
|
Taconic Golf Club |
Alteration: $35,000 | |
Architect: William Kirby, Jr. | |
1970
|
Heating Plant |
Addition and alteration (oil storage facility): $615,000 | |
Engineer/Architect: Lockwood Greene Co. | |
1970
|
Lasell Gym – Women’s Athletic Facility |
Design and Construction: $125,000 | |
Architect: Lockwood Greene Co. | |
1970
|
John A. Shaw Boathouse |
Architect: Jonathan Rose ’63 | |
1970
|
Herbert S. Towne Field House (Herbert S. Towne ’21) |
Design and Construction : $1,000,000 | |
Engineer: Lockwood Greene Co. | |
1971 | Baxter Hall – Radio Station – WCFM |
1971
|
Mission Park Residential Houses |
(Samuel John Mills 1809; Samuel Chapman Armstrong 1862; James Bissett Pratt 1898; Tyler Dennett 1904) | |
Design and Construction: $5,415,000 | |
Architect: Mitchell-Giurgola Associates | |
1972
|
Dodd Annex (formerly Williams Inn) |
Williams Inn Annex #3: $39,000 | |
Designed by: Peter P. Welanetz, P.E. | |
1972
|
Morgan Hall |
Renovation: $759,000 | |
Architect: Winthrop M. Wassenar, P.E. | |
1972
|
Tyler Annex |
Cost: $532,000 | |
Architect: Unitec Inc. and Gary Lindstrom and Associates | |
1973
|
Chaffee Tennis House (Clarence Chaffee) |
Design and Construction: $13,000 | |
Designed by: Peter P. Welanetz, P.E. | |
1975
|
Sawyer Library (John Edward Sawyer ’39) |
Design and Constructioni : $4,916,000 | |
Architect: Harry Weese and Associates | |
1976
|
Service Building |
Storage building: $17,000 | |
Fabricator: Agway Inc. | |
1976-77
|
Stetson Hall |
Renovation: $744,000 | |
Architect: Harry Weese and Associates | |
1977
|
Chapin Hall |
Renovation Phase I: $400,000 | |
Architect: Cambridge Seven Associates, Inc. | |
1978
|
Bernhard Music Center (Arnold Bernhard ’25) |
Brooks-Rogers Recital Hall (Mrs. Belvidere Brooks and Alan Rogers ’09) | |
Presser Choral Hall (Theodore Presser) | |
Phase II: $2,300,000 | |
Architect: Cambridge Seven Associates, Inc. | |
1978
|
Garfield House (Henry Augustus Garfield 1885) |
Renovation: $501,000 | |
Architect: Gary Lindstrom and Associates | |
1979
|
Fire Protection Safety Systems |
Cost: $104,750 | |
1982
|
Herbert S. Towne Field House |
Storage Addition: $35,670 | |
Architect: David J. Westall, R.A. | |
1983
|
Adams Memorial Theatre |
Down stage addition: $937,000 | |
Architect: Cambridge Seven Associates, Inc. | |
1983
|
Dimension Phone System |
Purchase and installation: $42,000 | |
1983
|
Faculty House/Alumni Center |
Addition: $1,245,000 | |
Architect: Cambridge Seven Associates, Inc. | |
1983
|
Lawrence Hall – Williams College Museum of Art |
Phase I: $4,980,000 | |
Architect: Moore, Grover and Harper | |
1984
|
Baxter Hall |
Phase I: $916,000 | |
Architect: John Jordan, P.A. | |
1984
|
Heating Plant |
Economizer: $127,700 | |
Engineer: Pope Engineers | |
1984
|
Jesup Hall (Morris Ketchum Jesup) |
Computer Center: $1,960,500 | |
Architect: John Jordan, P.A. | |
1984
|
Mather House |
Admissions Office Renovation: $114,500 | |
Architect: David J. Westall, R.A. | |
1984
|
Mears House |
Alumni/Development Offices: $477,300 | |
Architect: John Jordan, P.A. | |
1984
|
Spring Street |
Parking Lot: $173,350Architect: William Kirby, Jr. | |
1984
|
Stetson Hall – Roper Center |
Career Counseling: $113,000 | |
Architect: John Jordan, P.A. | |
1984
|
Thompson Chemistry Lab |
Lab renovations – lower level west: $189,480 | |
1984
|
Weston Field Press Box |
Replacement: $95,000 | |
Architect: David J. Westall, R.A. | |
1985
|
Baxter Hall |
Phase II: $515,000 | |
Architect: John Jordan, P.A. | |
1985
|
Bronfman Science Center |
Basement Classrooms: $501,000 | |
Architect: Hallock Architects, Inc. | |
1985
|
Chandler Commercial Building (John Wesley Chandler) |
Retail/office building: $700,000 | |
Architect: Cambridge Seven Associates, Inc. | |
1985
|
Faculty Art Studio/College Garage |
Renovation: $330,000 | |
Architect: Burr and McCallum Architects | |
1985
|
President’s House |
Renovation: $170,300 | |
1985
|
Service Building |
Garage: $257,000 | |
Architect: David J. Westall, R.A. | |
1985
|
Taconic Golf Club |
Addition – Women’s Locker Room: $200,000 | |
Architect: William Kirby, Jr. | |
1985
|
Mary Clark Thompson Center for Health Services |
Cost: $721,000 | |
Architect: David J. Westall, R.A. | |
1985
|
Thompson Physics Lab |
Renovation: $895,500 | |
Architect: Hallock Architects, Inc. | |
1985
|
Williams Oxford |
Improvements: $607,000 | |
Architect: The Oxford Architects Partnership | |
1986
|
Cole Field House |
Renovation: $105,000 | |
Architect: David J. Westall, R.A. | |
1986
|
Lawrence Hall – Williams College Museum of Art |
Phase II: $2,571,500 | |
Architect: Centerbrook Architects, Inc. | |
1986
|
Thompson Hall |
Conversion to Dorm: $377,000 | |
Architect: Hallock Architects, Inc. | |
1986
|
Williams Club, New York |
Cost: $520,500 | |
1987
|
John Wesley Chandler Athletic Facility and Lasell Renovations |
Feasibility Study: $35,000 | |
Design and Construction : $16,282,000 | |
Retail Space/Athletic Offices: $700,000 | |
Architect: Cambridge Seven Associates, Inc. | |
General Contractor: Fontaine Brothers | |
1987
|
Mears West |
Renovated for Alumni Office expansion: $556,400 | |
Architect: John Jordan, P.A. | |
1987
|
Weston Field |
New Plansky Track (Tony Plansky) and relocate baseball field: $1,243,100Architect: Saratoga Associates | |
1987-92
|
Thompson Biology Lab |
1987-88 Lab Renovation – Phase I: $273,985 | |
1988-89 Lab Renovation – Phase II: $204,680 | |
1988-89 Lab Renovation – Phase III: $ 70,150 | |
1991-92 Lab Renovation – Phase IV: $ 64,226 | |
1988
|
Grundy’s Garage |
Purchased: $445,000 | |
1988
|
Lasell Gym |
Renovation: $3,000,000 | |
Architect: Cambridge Seven Associates, Inc. | |
1989
|
Clark Hall (Edward Clark 1831) |
Geology Lab Renovation: $117,913 | |
1989
|
Fayerweather Hall |
Renovation: $400,000 | |
1989
|
Heating Plant |
Co-generation: $340,900 | |
Architect: vanZelm, Heywood, & Shadford | |
1989
|
Hopkins Hall |
Renovations and new addition: $9,300,000 | |
Architect: Architectural Resources Cambridge, Inc. | |
General Contractor: Barry Bette and Led Duke | |
1989
|
Weston Language Center |
Phases I-IV: $1,037,125 | |
Architect: William Kirby, Jr. & David J. Westall, R.A. | |
1990
|
Computer Network Equipment |
Cost: $2,665,050 | |
1990
|
Jenness House (Arthur Freeman Jenness) |
Multicultural Center | |
Cost: $27,300 | |
1990
|
Jewish Religious Center |
Design and Construction: $1,457,450 | |
Architect: Herbert Newman Associates AIA, P.C. | |
General Contractor: GSS Construction | |
1990-91
|
Mission Park |
Renovations – Phases I-III: $2,885,000 | |
1991
|
East College |
Renovation: $330,412 | |
1991
|
Sawyer Library Automation |
Cost: $650,000 | |
1991
|
Pine Cobble Faculty Housing Subdivision |
Cost: $7,612,000 | |
1991
|
Williams Oxford |
Renovation: $75,000 | |
1992
|
Danforth Block |
Renovation: $815,798 | |
1992
|
Morgan Hall |
Renovations: $1,572,568 | |
Architect: Weese Langley Weese | |
1993
|
Currier Hall |
Renovation and refurbishment: $685,082 | |
1993
|
Dodd House (Cyrus Morris Dodd 1855) |
Renovation and refurbishment: $886,702 | |
1993
|
Poker Flats (formerly Stetson Road Apartments) |
Conversion to student housing: $1,600,000 | |
Architect: Einhorn Yaffee Prescott | |
1993
|
Sawyer/Hopkins Hall |
Air Conditioning: $745,942 | |
1993
|
Sawyer Library |
Renovation: $3,200,000 | |
Architect: Weese Langley Weese | |
1994
|
Bascom House (John Bascom 1849) |
Renovation: $537,846 | |
1994
|
Fitch House (Ebenezer Fitch) |
Renovation: $944,270 | |
1994
|
Perry House (Arthur Latham Perry 1852) |
Renovation: $968,874 | |
1994
|
Spencer House (Philip Spencer) |
Renovation: $845,046 | |
Architect: EDM | |
1995
|
Kellogg House – Center for Environmental Studies (Ebenezer Kellogg) |
Matt Cole Library addition: $350,729 | |
Architect: Ann Beha Associates | |
1996
|
Center for Development Economics |
Renovation: $1,239,862 | |
1996
|
Goodrich House (Frank Goodrich) |
Renovation: $141,168 | |
Architect: Christopher Williams | |
1996
|
WLS Spencer Studio Art Building (Wadsworth Littleford Stegeman) |
Design and Construction: $5,606,660 | |
Architect: Carlos Jiminez Associates/Cambridge Seven Associates | |
1996
|
Williams Hall/Sage Hall |
Renovation: $9,797,306 | |
Architect: Einhorn Yaffee Prescott | |
General Contractor: Barry Bette and Led Duke | |
1997
|
Cole Field House |
Renovation: $1,727,923 | |
Additional Funding: $247,000 | |
Architect: Baron & Hammer | |
1997
|
Droppers House (Garrett Droppers) |
Renovation/Addition: $52,071 | |
Architect: Christopher Williams | |
1997
|
Griffin Hall |
Phases I-III: $2,750,000 | |
Architect: Childs Bertman Tseckares | |
1997
|
Simon Squash Courts (Carol Girard and Cynthia Stewart Simon Squash Center) |
Renovation: $3,800,000 | |
Architect: Wurmfeld Associates | |
1997
|
Susan Hopkins House (Susan Sedgwick Hopkins) |
Renovation: $160,094 | |
Additional Funding: $67,000 | |
1997
|
Woodbridge House |
Renovation: $244,940 | |
Additional Funding: $117,000 | |
1998
|
Clarence Chaffee Tennis House |
Torrence M. Hunt ’44 Tournament Courts | |
Rebuilt tennis house and court improvements: $279,668 | |
Todd Hunt Tennis Center: $167,694 | |
Architect: Christopher Williams | |
1998
|
Doughty House (William H. Doughty Jr. 1898) |
Renovation and refurbishment: $362,973 | |
1998
|
Mears House |
Renovation/AC: $220,339 | |
1998
|
Seeley House (Charles F. Seeley) |
Restoration: $54,563 | |
1998
|
Thompson Hall Dorm |
Renovation: $1,121,774 | |
Architect: Thomas Bartels | |
1999
|
Class of 1937 House/Children’s Center |
Renovation: $395,187 | |
Architect: Dignard Architectural Services | |
1999
|
East/Fayerweather |
Single Sex Bathrooms: $532,462 | |
Architect: H.P. Rovinelli Architects | |
1999
|
Fernald House |
Renovation/Code Issues: $209,665 | |
1999
|
Ft. Hoosac Renovation |
Renovation: $167,222 | |
Architect: Bob Holdridge | |
1999
|
Goodrich Hall |
Conversion to Student Activity Center: $2,430,251 | |
Architect: Bruner/Cott Associates | |
Refurbish and install Tenney Window: $12,150 | |
Cummings Studios | |
1999
|
Greylock Housing |
Code Deficiencies and Network Cabling: $244,000 | |
1999
|
Mt. Hope/Elm Tree House |
Renovation/Code Work: $538,966 | |
Architect: Einhorn Yaffee Prescott | |
1999
|
Tyler House-Phase I |
Renovation: $50,000 | |
1999
|
West College |
Renovation: $850,074 | |
Architect: Primary Group | |
1999
|
Wood House (Hamilton B. Wood ’10) |
Renovation: $1,047,897 | |
Architect: Primary Group | |
2000
|
Brooks House |
Renovation: $933,559 | |
Architect: Thomas Bartels | |
2000
|
Garfield House |
Renovation: $313,515 | |
Architect: Thomas Bartels | |
2000
|
Greylock Housing-Bryant/Mark Hopkins |
Renovation: $2,500,000 | |
Architect: Black River Design | |
Contractor: MLB | |
2000
|
Lambert House (Anna Elizabeth Lambert) |
Renovation: $105,862 | |
Architect: Mollenburg and Betz | |
2000
|
Milham House (Willis I. Milham 1894) |
Renovation: $244,611 | |
2000
|
Weston Field Grandstand |
Relocation and Renovation: $254,745 | |
Architect: Christopher Williams | |
2001
|
The Carl W. Vogt ’58 House (formerly 63 Park Street) |
Renovation: $1,594,717 | |
Sitework: $150,000 | |
Architect: Mark Hammer | |
2001
|
American Legion |
New Construction: $791,205 | |
Architect: Hill Architects | |
2001
|
Chaffee Tennis House |
Todd Hunt Tennis Center | |
Construction of Additional Courts: $167,694 | |
2001
|
Dodd Dining Renovation |
Renovation: $1,045,705 | |
Architect: Centerline | |
General Contractor: Cutler | |
2001
|
Greylock Housing-Carter/Gladden |
Renovation: $3,268,596 | |
Architect: Black River Design | |
Contractor: MLB | |
2001
|
Heating Plant Upgrade |
Upgrade: $969,859 | |
2001
|
Hubbell House (Mary Hubbell) |
Renovation: $276,543 | |
Architect: David Westall | |
General Contractor: Renau | |
2001
|
Parsons House (Eben B. Parsons 1859) |
Renovation: $245,827 | |
Architect: David Westall | |
2001
|
Tyler Annex Renovation |
Renovation: $966,457 | |
Architect and General Contractor: Breadloaf | |
2001
|
Tyler House Renovation-Phase II |
Renovation: $1,282,174 | |
Architect and General Contractor: Breadloaf | |
2001
|
Morley Science Laboratories and Schow Science Library |
Edward William Morley/Nan and Howard Schow | |
Science Library and Thompson Labs Renovations: $47,827,700 | |
Architect: Einhorn Yaffee Prescott/Zimmer Gunsul Frasca | |
General Contractor: Gilbane Building Company | |
2002
|
Alumni House/The Log Renovation |
Renovation: $104,874 | |
Architect: David Westall | |
General Contractor: Renau | |
2002
|
Heating Plant Upgrade |
Boiler 3 Replacement: $3,300,000Electrical Cogeneration: $2,700,000 | |
Auxiliary Systems: $693,889 | |
Architect: Childs Bertman Tseckares | |
General Contractor: Pizzagalli | |
2002
|
Mather House |
Relocation to Stetson Court and Renovation: $497,187 | |
Architect: Thomas Bartels | |
General Contractor: Renau | |
2002
|
Mission Park Dining Renovation Phase I |
Renovation: $3,061,876 | |
Architect: Centerline | |
General Contractor: Breadloaf | |
2002
|
Thompson Hall Student Parking Lot |
Design and Construction: $300,339 | |
Architect: Halvorson | |
2003
|
Bascom House Renovation |
Conversion to Admissions: $408,622 | |
Architect: EDM | |
General Contractor: Renau | |
2003
|
Brooks B Parking Lot Expansion |
Expansion: $166,604 | |
Engineer: Vince Guntlow | |
Contractor: Petricca | |
2003
|
Lansing Chapman Rink Renovation |
Renovation: $922,021 | |
Dasher Boards: $167,938 | |
Engineer: RFS | |
Contractor: American Refrigeration | |
2003
|
MSL Neuroscience Lab 022 |
Animal Lab Conversion: $254,012 | |
Paul Solomon’s Office: $19,394 | |
Architect: Einhorn Yaffee Prescott | |
General Contractor: Tierney | |
2003
|
Parking Garage |
Design: $400,000 | |
Sitework and Construction: $5,393,158 | |
Architect: William Rawn Associates | |
General Contractor: Barr & Barr | |
2003-04
|
High Voltage Distribution System Expansion |
Expansion: $349,974 | |
Electrical System Repairs: $775,000 | |
Engineering Consultant: vanZelm, Heywood and Shadford | |
General Contractor: Pizzagalli | |
2003-04
|
Mission Park Renovation Phase II |
Student Life Improvements: $1,835,376 | |
Network Upgrade: $650,000 | |
Life Safety and ADA: $3,283,919 | |
Architect: Centerline | |
General Contractor: Breadloaf | |
2003-04
|
33 Tenison Road, Cambridge, England |
Purchase and Renovation: $1,142,155 | |
2004
|
Baxter Hall |
Demolished 10/2004 | |
2004
|
Central Chilled Water Plant |
Planning, Site Work and Preliminary Design: $250,000 | |
Construction: $4,180,587 | |
Architect: William Rawn Associates | |
General Contractor: Barr & Barr | |
2004
|
Chadbourne House Renovation (Paul Ansel Chadbourne) |
Design: $50,000 | |
Renovation: $497,798 | |
Architect: EDM | |
General Contractor: Renau | |
2004
|
Renzie Lamb Synthetic Turf Field |
Cost: $1,993,460 | |
Architect/General Contractor: Clark Companies | |
2004
|
New Baseball Field-Cole Field |
Bobby Coombs Baseball Field: $510,814 | |
2004
|
North Campus Utilities Phase I |
Cost: $3,500,000 | |
Chilled Water to Chapin: $350,000 | |
Engineer: VanZelm Heywood & Shadford | |
General Contractor: Breadloaf | |
2004
|
Southworth School Renovation |
Acquisition: $400,000 | |
Design and Conversion: $5,504,500 | |
Architect: Black River Design | |
General Contractor: Engelberth | |
2004-2012
|
Stetson/Sawyer Project |
Programming: $1,000,000 | |
Design: $2,000,000 | |
Design: $2,000,000 | |
Design Completion and Construction: $123,000,000 | |
Architect: Bohlin Cywinski Jackson | |
General Contractor: Barr & Barr | |
2004
|
Thompson Memorial Chapel |
Centennial Celebration Restoration – $414,424 | |
Windows-Lead Replacement – $106,619 | |
Architect: Ryan-Biggs | |
General Contractor: Allegrone | |
2004-05
|
Prospect House Renovation Phase I and II |
Student Life Improvements: $1,953,089 | |
Renovation: $3,473,180 | |
Radio Station: $423,390 | |
Architect: Black River Design | |
General Contractor: MLB | |
2005
|
AMT Renovation |
Improvements: $1,762,027Renovation: $3,200,173 | |
Architect: William Rawn Associates | |
General Contractor: Barr & Barr | |
2005
|
B&L Building |
Acquisition: $300,000 | |
Design, Demolition and Construction: $3,401,104 | |
Additional Funding: $670,000 | |
Architect: Burr & McCallum | |
General Contractor: Tierney | |
2005
|
Class of ’62 Center for Theatre and Dance |
Project Cost: $52,194,310 | |
Design and Construction: 50,300,000 | |
Additional funding: $1,500,000 | |
Theater Consultant: Robert Davis, Inc. | |
Architect: William Rawn Associates | |
General Contractor: Barr & Barr | |
2005
|
Eph’s Monument and Gravesite Restoration |
Restoration: $323,487 | |
Architect: Elmore Design | |
General Contractor: E.T. O’Connor | |
2006
|
Agard Renovation |
Design: $100,000 | |
Renovation: $1,899,349 | |
Architect: Woodward, Connor, Gillies , Seleman | |
General Contractor: Renau | |
2006
|
Fernald House |
Demolished 9/12/06 | |
2006
|
North Campus Utilities Phase II |
Cost: $2,777,039 | |
Engineer: VanZelm, Heywood and Shadford | |
General Contractor: Barr & Barr | |
2006
|
Morgan Hall Renovation |
Design: $200,000 | |
Construction: $6,089,058 | |
Architect: Black River Design | |
General Contractor: Barr & Barr | |
2006 | Wireless Implementation: $572,427 |
2007
|
Children’s Center |
Expansion Feasibility Analysis: $34,992 | |
Site Selection: $75,000 | |
Design: $370,575 | |
Design and Construction: $5,775,000 | |
Architect: D.W. Arthur Associates Architects | |
Contractor: Engleberth | |
2007
|
Fitch House Cornice Repair |
Design: $60,000 | |
Construction: $1,109,000 | |
Architect: MCWB/Ryan-Biggs | |
General Contractor: Allegrone | |
2007
|
Paresky Center (David Paresky ’60 and Linda Paresky) |
Programming and Pre-design: $1,000,000 | |
Design Consultants: $2,500,000 | |
Construction: $35,200,000 | |
Contaminated Soil Clean-Up: | |
Additional Funding – $8,500,000 | |
Architect: The Polshek Partnership | |
General Contractor: Breadloaf | |
2008
|
Athletic Complex |
Master Planning: $200,000 | |
2008
|
Garfield |
Renovation design: $200,000 | |
2008
|
Goodrich Hall |
Great Hall Structural Repair: $400,000 | |
2008
|
Kellogg House |
Relocation and Renovation | |
2007-08
|
Off-Site Storage Building |
Simonds Road Property Purchase and Development: $2,350,000 | |
General Contractor: Barr & Barr | |
2008-09
|
Weston Field Improvements |
Design and Construction: $17,600,000 | |
Architect: Moser Pilon Nelson/Clark Companies | |
General Contractor: Daniel O’Connell’s Sons, Inc. | |
2008
|
Weston Language Center |
Renovation | |
2009
|
Campus Wide |
Steam Metering (phase 2 of 2): $813,704 | |
2010
|
Parking Garage |
North Campus Central Chiller Plant: $1,446,196 | |
2011
|
Kellogg House |
Relocation to Mission Park Drive: $750,000 | |
2013
|
Bernhard Music Center |
Fire Protection: $845,075 | |
2013
|
Bronfman Science Center |
BSC 064/065 Lab Renovations: $131,667 | |
2013
|
Brooks/Perry/Dodd |
Brooks/Perry/Dodd Transformer: $546,020 | |
2013
|
Campus |
Campus Arc Flash Hazard Mitigation Plan: $224,593 | |
Campus Mechanical Insulation Retrofit: $155,945 | |
Campus Fiber Infrastructure Upgrades: $650,000 | |
SW Campus Sector Plan: $400,000 | |
Fac Rental Housing Chimney Repair: $138,762 | |
Campus Sewer Replacement N Campus: $98,012 | |
2013
|
Cole Field |
Cole Field Portable Video Tower: $15,857 | |
Resod Field I (Womens Practice Field): $132,940 | |
2013
|
CTD |
CTD Auditorium handrailings: $113,896 | |
2013
|
East College |
East College ADA Improvements | |
2013
|
Faculty House |
Faculty Club Retro Commissioning: $2,400 | |
2013
|
Fort Hoosac |
Ft Hoosac Program & Space Stdy: $31,002 | |
2013
|
Heating Plant |
#6 Fuel Oil Storage for Heating: $450,265 | |
2013
|
Hollander Hall |
Hollander Hall, Faculty Lounge: $4,620 | |
2013
|
Hopkins Hall |
Security Central Station Ugrades: $500,117 | |
Hopkins Hall Sprinkler Line Repair: $30,531 | |
2013
|
Jesup Hall |
Jesup Data Center Assess Study: $51,719 | |
2013
|
Kellog House |
Environmental Center Project: $5,205,158 | |
Design Team: Black River Design | |
Construction Team: Consigli | |
2013
|
Lansing Rink |
Lansing Chapman Rink PA system: $63,860 | |
Chapman Rink Roof Deferred Maintenance: $80,000 | |
2013
|
Lasell Gymnasium, East College, Sloan House |
Lasell East-Pres House Roof Repair: $67,054 | |
2013
|
Lawrence Hall |
Lawrence Hall Faculty Office Renovations: $79,050 | |
2013
|
Miller House |
Miller House – 2nd Floor Modifications: $13,929 | |
2013
|
MSL |
MSL Chiller #3 Emergency Replacement: $300,031 | |
2013
|
Paresky |
Paresky chair & table upgrades: $66,393 | |
2013
|
Science Quad |
Science Quad Walkway Repairs: $52,075 | |
2013
|
Shaw Boathouse |
Shaw Boat House Repairs: $64,982 | |
2013
|
Simon Squash Courts |
Squash Courts, refinishing courts: $10,900 | |
2013
|
Spencer Art |
Spencer Studio Art Roof Repair: $638,191 | |
Spencer Studio Arts 216 Lighting Upgrades: $675 | |
2013
|
TPL |
TPL Chalkboards: $17,961 | |
2013
|
Vogt House |
Vogt House Study: $50,000 | |
Vogt Hse-Chilled Water Line Extension: $75,229 | |
2013
|
Weston Field |
Weston Athletic Complex Project: $23,672,699 | |
Design Team: CHA | |
Construction Team: Whiting Turner | |
2014
|
B&L |
B&L 2nd Floor Build-out Rm 201: $159,737 | |
2014
|
Beals House |
Beals House Renovation: $174,276 | |
2014
|
Bernhard Music Center |
Bernhard Presser Choral: $39,900 | |
Bernhard portico roof replacement: $67,000 | |
2014
|
Bronfman Science Center |
Bronfman condition assessment: $436,587 | |
BSC 019 lab renovation: $34,131 | |
BSC 358,361&363 Improvements: $103,740 | |
2014
|
Brooks House |
Center for Learning in Action: $61,879 | |
2014
|
Campus |
Campus Exterior Lighting Retrofits: $149,995 | |
2014
|
Chandler Athletic |
Chandler Pool HVAC&DDC Upgrades: $207,356 | |
2014
|
Clark Hall |
Clark Hall-GeoSci Countertops: $26,471 | |
2014
|
Cole Field |
Cole Field-Game Centers: $60,336 | |
2014
|
Danforth Block |
Danforth-Hockey Rink Parking Lot Paving: $401,218 | |
2014
|
Faculty House |
Faculty Hse Electrical Upgrade: $98,334 | |
2014
|
Grundy’s Garage |
Grundy’s Garage space utilization study: $2,001 | |
Grudy Art Studio Build Out: $146,950 | |
2014
|
Harper House/Mather House |
Harper/Mather House Feasibility Study: $34,265 | |
2014
|
Heating Plant |
#6 Fuel Oil Storage Phase 2: $898,304 | |
Heating Plant – CHP Assessment: $82,000 | |
2014
|
Jesup Hall |
Jesup Hall Window Replacement: $148,720 | |
2014
|
Lawrence Hall |
WCMA small offices reconfiguration: $124,440 | |
WCMA condition assessment: $214,425 | |
2014
|
Mears House |
Mears House Improvements: $531,429 | |
2014
|
MSL |
Renoations to rooms 124, 126 and 128: $42,614 | |
2014
|
Paresky |
Retro-commissioning: $58,213 | |
2014
|
Parking Garage |
Exterior Lighting: $63,778 | |
2014
|
South House |
South House Mechanical & Electrical Upgrades: $90,832 | |
2014
|
Spencer Art |
Spencer Studio Art – Sloan House Steamline Repair: $260,345 | |
Sculpture Studio Repair & Renovation: $20,006 | |
Spencr Studio Art HVAC: $96,770 | |
2014
|
Spencer House |
Spencer House Envelope Renovation Phase I: $404,148 | |
2014
|
TBL |
Office 103 Renovations: $14,926 | |
2014
|
The Log |
The Log Revitalization Program: $70,370 | |
2014
|
Unified Science Center |
Renovations to: MSL 257 TCL 210 BSC 227,228,229 Cost: $208,454 |
|
2015
|
Athletics Buildings |
General Painting: $159,041 | |
2015
|
American Legion |
Legion Classroom upfit: $49,346 | |
2015
|
Bernhard Music Center |
Environmental Improvements: $351,607 | |
2015
|
Campus |
Electric Vehicle Chrarge Station: $8,501 | |
2015
|
Chandler Athletic |
Pool HVAC & DDC Replacement: $1,012,867 | |
2015
|
Chandler Commercial |
Chandler Commercial HVAC: $12,600 | |
2015
|
Cole Field |
Resod men’s & women’s soccer fields: $130,238 | |
2015
|
Coles Grove Road |
Coles Grove Road Repaving: $210,672 | |
2015
|
Faculty House |
Elevator Modernization: $58,413 | |
2015
|
Lasell Gymnasium |
Lasell Clock Renovation: $91,500 | |
2015
|
Mason House |
Mason house repairs: $11,946 | |
2015
|
Patrie House |
Patrie Hse-Energy Upgrade: $65,932 | |
2015
|
Shool House |
School House Renovation: $26,955 | |
2015
|
Spencer House |
Spencer House Envelope Renovation: $11,705 | |
2015
|
Tyler House |
Drive & Parking Repaving: $161,680 | |
2015
|
Unified Science Center |
Various Lab Renovations: $151,608 | |
2016
|
Adams Block |
Adams Block Roof Replacement: $95,648 | |
2016
|
Athletic Storage Building |
Athletic Storage Building: $80,000 | |
2016
|
B&G |
Facilities Roof: $245,873 | |
2016
|
B&G North |
Art Studio build out for Faculty: $300,000 | |
2016
|
Bascom House |
Bascom House Renovation: $269,209 | |
2016
|
Bernhard Music Center |
Replace Transformer-Bernhard & Chapin: $190,400 | |
2016
|
Bronfman Science Center |
Bronfman Science Center Abatement: $2,338,806 | |
Contractor: American Environmental | |
2016
|
Brooks House |
Brooks Parking Lot Connector Paving: $139,206 | |
2016
|
Campus |
Hoxsey St. Widening: $127,656 | |
Replace Lines – Lasell/Hopkins: $225,000 | |
Medium Voltage Expansion – SE: $965,520 | |
Campus-Wide Masonry Mortar Study: $132,000 | |
2016
|
Chaffee Tennis House |
Resurfacing Competition Courts: $2,350,000 | |
2016
|
CTD |
CTD Main & Center Stage Elevator: $250,000 | |
Sound Transmission in CTD: $50,000 | |
2016
|
Currier Hall |
Retaining Wall-Currier Fitch: $80,000 | |
2016
|
East College |
East College Main Electrical: $350,000 | |
2016
|
Faculty House |
Faculty House-Replace Dining Room Chairs: $40,000 | |
2016
|
Fellows Hall |
Fellows Hall Construction Project: $15,009,861 | |
Design Team: PBDW Architects | |
Construction Team: Cummings Construction | |
2016
|
Goodrich Hall |
Goodrich Hall Envelope Restoration Project: $4,959,000 | |
Design Team: Christopher Williams Architects | |
Construction Team: Allegrone | |
2016
|
Goodrich House Hubbell House |
Goodrich & Hubbell Waterproofing: $50,000 | |
2016
|
Heating Plant |
Condensate piping replacement: $250,000 | |
2016
|
Hopkins Hall |
CSS Interior Renovations: $375,000 | |
Elevator Modifications: $100,000 | |
Dean’s Office Renovations: $225,000 | |
Hopkins Hall Modfications: $50,000 | |
2016
|
Hopper Science Center |
Enabling Cost: $5,342,548 | |
Construction Cost: $81,360,435 | |
Design Team: Payette Architects | |
Construction Team: Consigli | |
2016
|
JRC |
Interior Modifications: $172,500 | |
2016
|
Lawrence Hall |
WCMA Security Pulpit Renovation: $10,000 | |
WCMA Print Room Remodel: $65,000 | |
2016
|
Mears House |
Career Center Office – M 208 Remodel: $200,000 | |
2016
|
Mission Park |
Mission Park Roof Replacement: $950,000 | |
2016
|
Modular Facilities Classrooms |
Modular Facilitiy Clasrooms: $1,643,783 | |
2016
|
Modular Facilities Offices |
Modular Facility Offices: $4,500,000 | |
2016
|
Morey & Stocking Houses |
Morey & Stocking Renovations: $145,000 | |
2016
|
MSL |
Replace Morley Chiller #2: $380,000 | |
2016
|
New Museum |
ARTS Programming & Space Utilization Study: $701,123 | |
2016
|
Parking Garage |
Parking Garage Access Road Improvements: $300,000 | |
2016 Chilled Water Upgrades: $290,600 | |
2016
|
Saint Anthony’s Hall |
Saint Anthony’s Hall Renovation: $16,737,617 | |
Design Team: Centerline Architects | |
Construction Team: Engelberth Construction | |
2016
|
Schow Library |
Schow Library Classroom Renovations: $1,750,592 | |
Computer Science Gaming Classroom: $153,849 | |
2016
|
Sloan House |
President’s House Walkway: $22,855 | |
2016
|
Southworth School |
Southworth School-Elevator Modernization: $65,000 | |
2016
|
Spencer House |
Spencer House Envelope Restoration: $200,000 | |
2016
|
TBL |
Computer Science Labratory Renovation: $550,000 | |
2016
|
TCL |
Thompson Chemistry Lab Entryway Reconfiguration: $270,164 | |
TCL/TPL Window Replacement: $24,000 | |
2016
|
The Bookstore |
Williams College Bookstore: $10,500,000 | |
Design Team: Cambridge Seven Architects | |
Construction Team: Engelberth Construction | |
2016
|
Town Field House |
Towne Fieldhouse Facility Condition Assessment: $150,000 | |
2016
|
Unified Science Center |
Thompson Sidewalk Replacement: $275,000 | |
ECO Cafe Renovation: $106,000 | |
Lab renovation-new Physicist: $53,077 | |
TBD-New lab space: $108,976 | |
2016
|
Wachenheim Science Center |
North Building Construction $93,991,045 | |
Design Team: Payette Architects | |
Construction Team: Barr & Barr | |
2017
|
TPL |
Physicist’s Lab Reno FY17: $43,485 | |
2017
|
B&G |
Facilities-Heating Improvements: $300,000 | |
2017
|
Campus |
South Campus Drainage Improvements – Phase 1: $315,000 | |
2017
|
Chandler Athletic |
Chandler faculty offices: $187,850 | |
2017
|
Chadbourne House |
Chadbourne Accessibility Renovations: $800,000 | |
2017
|
Chapin Hall |
Chapin Hall Canopy and AV: $1,000,000 | |
Chapin Hall roof Replacement: $635,000 | |
2017
|
Cole Field House |
Cole Field House-Elevator: $75,000 | |
2017
|
CTD |
CTD fire curtains replacement: $41,515 | |
CTD Control Conversion: $75,000 | |
CTD Assistive Listening System: $25,000 | |
2017
|
Danforth Block |
Danforth Block roof: $146,000 | |
2017
|
Doughty House |
Doughty Accessibility Renovations: $1,000,000 | |
2017
|
Facilities Agway |
Facilities Storage Facility: $1,550,000 | |
2017
|
Faculty House |
Faculty Club Chair Replacement F17: $40,000 | |
2017
|
Fitch Hall |
Fitch Heat Distribution: $303,209 | |
2017
|
Frosh Quad |
Frosh Quad Renovation: $1,450,000 | |
Design Team: | |
2017
|
Garfield House |
Garfield House Renovation: $12,495,000 | |
Design Team: SGA | |
Construction Team: Engleberth Construction | |
2017
|
Greylock Dining |
Greylock Dining code review: $9,000 | |
2017
|
Lawrence Hall |
WCMA/Lawrence 712 Art: $60,000 | |
2017
|
Mission Park |
Mission Disaster Recovery: $150,000 | |
Mission common areas: $149,244 | |
2017
|
MSL |
MSL 032/034 reconfiguration: $55,000 | |
2017
|
Mount Hope |
Mt Hope Bridge replacement: $1,011,842 | |
Design Build Team: J.H. Maxymillian | |
2017
|
Oxford |
Oxford 145 Banbury Refurbishment: $400,000 | |
2017
|
Rice House |
Rice House Structural Renovation: $91,000 | |
2017
|
Rosenburg Center |
Rosenburg Center Repairs: $56,000 | |
2017
|
Sage Hall |
Sage basement dehumidification: $11,000 | |
2017
|
TCL |
Chemistry Lab vacuum systems: $53,000 | |
2017
|
Thompson Health |
Thompson Health reconfiguration: $28,000 | |
2017
|
Water Street Books |
Water Street Books Study-Alterations: $14,000 | |
2017
|
WCCC |
WCCC Expansion Project: $660,000 | |
2017
|
Weston Hall |
Weston Hall #217 Alterations: $30,000 | |
Weston Hall West Stairs: $19,500 | |
2018
|
Campus |
Christmas Brook Culvert Project: $9,622,054 | |
Christmas Brook Restoration: $49,840 | |
Drainage pipe in Latham Street: $71,589 | |
Public parking lot drainage: $8,589,169 | |
2018
|
CTD |
CTD scene shop trap door: $35,000 | |
2018
|
Driscoll Dining |
Driscoll Lower Tables & Chairs: $25,000 | |
Driscoll Code Improvements: $2,554,642 | |
Design Team: EDM | |
Construction Team: Wright Builders | |
2018
|
Faculty House |
Faculty Club Chair Replacement: $40,000 | |
2018
|
Greylock Dining |
Greylock Dance Studio Project: $200,000 | |
2018
|
Grundy’s Garage |
Grundy’s Garage Artists’ Studio: $61,254 | |
2018
|
Lawrence Hall |
WCMA FY19 CIR Projects: $2,823,456 | |
WCMA Renewal Plan: $212,804 | |
WCMA Flooring 54 and Kroh Galleries: $111,130 | |
WCMA New Director’s Office: $2,611 | |
2018
|
LSF |
LSF Expansion: $5,500,000 | |
2018
|
Mission Park |
Mission Park Furniture Replacement: $150,000 | |
2018
|
Mount Hope |
Mt. Hope retaining wall reconstruction: $563,922 | |
2018
|
Oxford |
Oxford 145 Banbury Refubishments: $145,000 | |
2018
|
Pond House |
Hewat House Renovation: $2,745,000 | |
Design Team: EDM | |
Construction Team: Wright Builders | |
2018
|
Prospect House |
Prospect Maintenance Summer 22: $225,000 | |
2018
|
Sloan House |
President’s House Improvements: $2,350,000 | |
2018
|
Spencer House |
Spencer House envlope restoration phases 2&3: $1,637,420 | |
2018
|
TCL |
Thompson Chemistry Lab Upgrade: $170,000 | |
2018
|
The Williams Inn |
The Williams Inn $48,600,000 | |
Design Team: Cambridge Seven | |
Construction Team: Engelberth Construction | |
2019
|
Lawrence Hall |
Art Projection Booths Removal: $450,000 | |
2019
|
Campus |
Weston/Perry Steam Line Replacement: $300,000 | |
Campus Landscape Study: $360,000 | |
2019
|
Cole Field |
Cole Field Dugouts Replacement: $48,605 | |
2019
|
CTD |
CTD door replacement: $32,520 | |
2019
|
Currier Hall |
Currier roof and masonry repair: $400,000 | |
2019
|
Faculty House |
Faculty Club chair replacement: $40,000 | |
2019
|
Fayeweather Hall |
Fayeweather roof replacement: $250,000 | |
2019
|
Fitch Hall |
Fitch masonry repairs: $179,282 | |
2019
|
Fort Hoosac |
Fort Bradshaw renovation: $11,500,000 | |
Design Build Team: A/Z Corporation | |
2019
|
Grundy’s Garage |
Grundy’s art studio renovations: $1,032,844 | |
2019
|
Lansing Rink |
Lansing Rink boards: $110,000 | |
2019
|
Lasell Gymnasium |
Athletic complex — Locker room Study: $150,000 | |
2019
|
McGuiness House |
McGuiness House code improvements: $243,106 | |
2019
|
Morgan Hall |
Morgan Hall Roof Replacement: $1,300,000 | |
2019
|
Prospect House |
Key & Lock replacement: $308,795 | |
2019
|
Sawyer Library |
Sawyer library S2 security alarm improvements: $214,290 | |
2019
|
Thompson Health |
Thompson Health Center renovations: $600,000 | |
2019
|
Towne Field House |
Towne Field House track replacement: $907,349 | |
2019
|
TPL |
TPL roof replacement: $180,000 | |
2019
|
Weston Field |
Wall-ball Wall: $72,727 | |
2019
|
Williams & Sage |
Williams and Sage floor repair: $34,464 | |
2020
|
AMT |
AMT lighting system replacement: $814,723 | |
2020
|
Bernhard Music Center |
Bernhard Hall-renovate music rooms: $45,000 | |
2020
|
Brooks Hall |
Brooks Hall gutter replacement: $160,000 | |
2020
|
Chandler Athletic |
Athletics-furniture and workstations: $120,000 | |
Chandler varsity swim locker room renovations: $200,000 | |
2020
|
CTD |
CTD Mainstage sound system repair: $270,101 | |
CTD projector upgrade: $22,146 | |
CTD Mainstage counterweights: $22,689 | |
CTD power door operators: $68,604 | |
2020
|
Faculty House |
Faculty House critical repairs: $160,000 | |
2020
|
Jesup Hall |
Jesup Hall – UPS & ATS Replace: $250,000 | |
2020
|
JRC |
JRC millwork improvements: $56,415 | |
2020
|
Lansing Rink |
Hockey Rink Mats: $250,000 | |
2020
|
Paresky |
Paresky south patio replacement: $87,567 | |
2020
|
Sawyer Library |
Stetson Reading Room doors: $40,000 | |
2020
|
Spencer Art |
Spencer Studio Art printmaking: $131,824 | |
2020
|
Thompson Chapel |
Lower chapel parking lot repaving: $202,400 | |
2020
|
Vogt House |
Vogt roof and gutter replacement: $310,000 | |
2020
|
WCCC |
WCCC Infant Program Expansion: $340,971 | |
Children’s Center parking expansion: $75,000 | |
2020
|
Williams & Sage Halls |
Williams and Sage hall doors: $160,000 | |
2021
|
Campus |
Area Coordinator Apartments Review: $90,180 | |
2021
|
Chandler Athletic Center |
Chandler Plaza Snow Melt System: $50,000 | |
2021
|
Chapin Hall |
Chapin Hall Railing Replacement: $7,895 | |
2021
|
Doughty House |
Doughty House Roof Replacement: $388,847 | |
2021
|
Greylock Quad |
Greylock Quad Electrical Improvements: $1,525,688 | |
2021
|
Grundy’s Garage |
Grundy’s Garage Roof Replacement: $143,426 | |
2021
|
Heating Plant |
Heating Plant Control Systems: $165,285 | |
2021
|
Lasell Gymnasium |
Lasell Gym Handrails: $25,000 | |
2021
|
Mission Park |
Mission Park Walk-in Refrigeration Upgrades: $176,901 | |
2021
|
Paresky |
Paresky Refrigerant Lines: $233,346 | |
Whitman’s Servery Reconfiguration: $46,991 | |
2021
|
Saint Anthony’s Hall |
Saint Anthony Hall Sprinkler System: $62,000 | |
2021
|
Simon Squash Courts |
Simon Squash Gutter Replacement $127,601 | |
2021
|
WCCC |
Children’s Center Interior Painting: $65,100 | |
WCCC Modular Purchase: $160,500 | |
2022
|
Bernhard Music Center |
Shainman Renovations: $35,000 | |
2022
|
CTD |
CTD 283 dance studio lighting upgrades: $180,000 | |
2022
|
Lawrence Hall |
Lawrence Art Restroom Updates: $110,000 | |
2022
|
MSL |
MSL 134 Greenhouse Curtains: $46,600 | |
2022
|
Perry House |
Perry House Drainage Study: $150,000 | |
2022
|
Pond House |
North Side Lot Paving: $200,000 | |
Various Improvements: $75,000 | |
2022
|
Sawyer Library |
Collection Management Renovations: $85,000 | |
2022
|
Spencer Art |
Spencer 216/Video Equipment Closet Renovations: $36,764 | |
2022
|
Unified Science Center |
Thompson and Morley Hydration Stations: $30,000 | |
2022
|
Weston Hall |
Weston Hall 3rd Floor Alterations: $132,783 |