Chronological List of Architecture

1791-93
West College (West Township original name of Williamstown)
Remodeled 1855 – central door out and north and south doors cut in. Remodeled 1904 and north door sealed up.
1801
President’s House (Samuel Sloan House)
Front part only; woodwork imported from Boston
1828
Griffin Hall (Edward Dorr Griffin)
Originally had double entrance and stood near Main St. Built by President Griffin at a cost of $6,000; served as chapel until 1859 (when Goodrich Hall was built), library built 1847, and lecture room; moved to northeast in 1904 and remodeled. The building was originally called “the brick chapel,” and was named Griffin Hall in 1859.
Architect: Harding and Seaver
1837
Hopkins Observatory (Albert Hopkins)
Built by Professor Albert Hopkins and students near East College. Moved in the 1850’s to the south end of the Berkshire Quad. In 1962, it was moved to the north end of the Berkshire Quad.Cost: $2,075
1842
East College
Rebuilt – the original building of 1798 burned in 1841. In 1907 larger doorways added.
Designed by J.S. Oakman ’99.
1842
South College (Fayerweather Hall)
Gold Coast addition to south in 1905 and the building renamed Fayerweather.
Architect: Allen & Collens
1846
Lawrence Hall (Amos Lawrence)
Octagonal Library, cost $7,000.
Architect: Thomas Tefft, (Providence).
East and west wings 1890; additions at rear in 1915, 1926, 1938. Became Art Museum in 1926.
1859
Goodrich Hall (John Zaccheus Goodrich)
Chapel and Alumni Hall – shift to stone (local dolomite) and to Gothic.
Architect: Gervase Wheeler
1882
Morgan Hall (Edwin Denison Morgan)
First campus building to be connected to a College heating plant. It was the first dorm to have plumbing, including indoor bathrooms.
Architect: J.C. Cady and Co. (N.Y.C.)
1886
Lasell Gymnasium (Edward Lasell ’28 and Josiah Lasell ’84)
Architect: J.C. Cady and Co. (N.Y.C.)
1893
Thompson Scientific Laboratories
Architect: Francis Allen (Allen & Collens)
(designed all three and rebuilt the chemistry building).
Chemistry Laboratory burned 1915, rebuilt 1916; enlarged and modernized 1941.
1897
Hopkins Hall (Mark Hopkins)
Based on Romanesque style of Henry Hobson Richardson;
memorial to Mark Hopkins (d. 1887).
Cost: $87,000
Architect: Francis Allen and Kenway (Boston)
1899
Jesup Hall (Morgan Ketchum Jesup)
Campus center, orange brick, painted yellow
Architect: George Tilden
Remodeled 1908 by John S. Oakman ’99
1902 College Garage
1905
Berkshire Hall (renamed Ebenezer Fitch Hall in 1971)
Architect: Francis R. Allen (Allen and Collens)
1905
Goodrich Hall
Remodeled and named Goodrich.
1905
Thompson Memorial Chapel (Frederick Ferris Thompson ’56)
Compare the Gothic of Goodrich Hall
Architect: Francis R. Allen (Allen and Collens)
Windows: The Church Decorating Company (N.Y.)
1905
Wood House (Hamilton B. Wood ’10)
Architect: John B. Snook, Inc. (New York)
1908
Currier Hall (Lura Ormsbee Currier)
Architect: Robins and J.S Oakman ’99
1908
Clark Hall (Edward Clark ’31) (Geology)
Old Clark Hall (wooden) pulled down 1886
Architect: Frank Wallis and William J. Rogers
1909
Spencer House (Philip Spencer)
Architect: James Purdon
1911
Thompson Hall Infirmary (Mary Clark Thompson)
Architect: Allen & Collens
1911
Williams Hall (Colonel Ephraim Williams)
Architect: (Ralph Adams) Cram, Goodhue and Ferguson
1911/12
Chapin Hall (Alfred Clark Chapin) (formerly Grace Hall named after Mrs. Chapin)
Cost: $259,313; cost of organ $45,800
Architect: (Ralph Adams) Cram, Goodhue and Ferguson
1922
Stetson Hall Library (Francis Lynde Stetson ’67)
Cost: $750,000
Architect: (Ralph Adams) Cram and Ferguson
1923
Sage Hall (Mrs. Russell Sage)
Architect: (Ralph Adams) Cram and Ferguson
Gate between Williams and Sage erected 1936
1925
Mears House (Brainerd Mears)
Architect: (Ralph Adams) Cram and Ferguson
1925
Tyler House (Lt. John Cowperthwaite Tyler ’15)
Architect: Andrews, Jones, Briscoe & Whitmore
1926
Cole Field House
Architect: Densmore, LeClare and Robbins (Boston)
1928
Lasell Extension South of Gymnasium
Architect: Densmore, LeClare and Robbins (Boston)
1928
Lehman Hall (Herbert Lehman ’99)
Architect: (Ralph Adams) Cram and Ferguson
1931
Taconic House (Fort Hoosac)
Architect: Grosvenor S. Wright
1934
Heating Plant
Architect: (Ralph Adams) Cram and Ferguson
1938
Faculty House/Alumni Center
Cost: $150,000
Architect: T.H. Ellett (N.Y.).
1938
Squash Courts
Architect: Shreve, Lamb ’04 and Harmon
1941
Adams Memorial Theatre (John Quincy Adams)
Cost: approx. $250,000
Architect: Hoyle (Cram and Ferguson)
Tech. Advisor: Stanley McCandless (Yale School of Drama)
1941
Alumni House/The Log
Architect: Kenneth Reynolds ’16
1946
Faculty Housing Project (Stetson Road Apartments-12)
Architect: Kenneth Reynolds ’16
1949-51
Thompson Physics and Biology Laboratory
Additions: $900,000
Architect: Des Granges and Steffian
1951
Weston Field House
Cost: $17,500
Designed by: Peter P. Welanetz, P.E.
1952
Alumni House
West College room addition: $28,000
Architect: Kenneth Reynolds ’16
1952
Griffin Hall
Restored: $29,000
Designed by: Peter P. Welanetz
1952
West College
Rebuilt: $225,000 (Fire 1/2/51)
Architect: Perry, Shaw, Hepburn, Kehoe and Dean
1953
Baxter Hall (James Phinney Baxter III ’14)
Cost: $1,500,000
Architect: Perry, Shaw, Hepburn, Kehoe and Dean
1953
Heating Plant
Addition: $300,000
Architect: Lockwood Greene Co.
1953
Lansing Chapman Rink and Machinery Building (William Lansing Chapman ’10)
Cost: $100,000Architect: Mollenburg and Betz
1953
Weston Field
Press Box built: $1,000
Designed by: Peter P. Welanetz, P.E.
1954
President’s House
Garage: $6,000
Designed by: Peter P. Welanetz, P.E.
1954/57
Currier Hall
Restoration and Music Department: $35,000
Designed by: Peter P. Welanetz, P.E.
1955
Baxter Hall – Rathskeller
Basement of Baxter Hall: $18,250
Designed by: Perry, Shaw, Hepburn, Kehoe and Dean & William C. Bryant
1955
Taconic Golf Club House
Cost: $70,000
Architect: Seymour Saltus
1956
East College
Rebuilt: $267,000
Architect: Cram and Ferguson
1956
Mather House (Benjamin F. Mather)
Restored: $37,000
Architects: William Gass and Peter P. Welanetz, P.E.
1956
Stetson Hall
Library Addition: $450,000
Architect: Cram and Ferguson
1957
Conversion of Electrical Distribution System
Conversion from 2300 to 4140 volts: $11,800
Designed by: Northern Berkshire Electric Co.
1957
Fayerweather Hall (Daniel F. Fayerweather)
Rebuilt: $325,000
Architect: Cram and Ferguson
1958-61
Thompson Chemistry Building
Alterations: $75,000
Designed by: A. B. Stanley and Peter P. Welanetz, P.E.
1961
Brooks House (Belvidere Brooks ’10)
Architect: Daniel O’Connell & Sons
1961
Lansing Chapman Hockey Rink
Canopy: $176,500
Architect: Lockwood Greene Co.
1961
Thompson Physics Library
Expansion: $12,000
1962
Hopkins Observatory (Albert Hopkins)
Moving of Observatory: $50,000
1962
New Planetarium – Hopkins Observatory
Cost: $25,000
Designed by: Spitz Laboratories
1962
Prospect House (Prospect Mountain)
Cost: $1,200,000
Architect: Shepley, Bulfinch, Richardson and Abbott
1962
Service Building
Cost: $200,000
Architects: William Kirby and Peter P. Welanetz, P.E.
1962
Stetson Hall – Roper Center
Addition to Stetson Library: $200,000
Architect: Hoyle, Doran and Berry
1962
Taconic Golf Club
Club House Addition: $55,000
Designed by: Peter P. Welanetz, P.E.
1963
Driscoll Dining Hall (Alfred E. Driscoll ’25)
Berkshire Quadrangle – dining/lounge building: $385,000
Architect: Shepley, Bulfinch, Richardson and Abbott
1963
Fitch House (formerly Berkshire Hall)
Restored: $180,000
Architect: The Architects Collaborative
1964
Currier Hall
Renovation: $180,000
Architect: The Architects Collaborative
1964
Thompson Chemistry Laboratory
Laboratory Remodeling: $75,000
Architect: William Kirby, Jr.
1964-65
Replacement and Extension of Steam Distribution System
Cost: $129,000
Engineer: Lockwood Greene Co.
1964-65
Thompson Memorial Chapel
Exterior major restoration
1965
Greylock Residential Houses
Design and Construction: $2,700,000
William Cullen Bryant, Franklin Carter, Washington Gladden, Mark Hopkins and Greylock Dining
Architect: The Architects Collaborative
1965
Karl E. Weston Language Lab (Karl Ephraim Weston ’96)
Alteration to former Phi Delta Theta Fraternity House
Designed by: Ralph W. Iacuessa
1968
Bronfman Science Center (Edgar M. Bronfman ’50)
Design and Construction : $3,750,000
Architect: Benjamin Thompson & Associates, Inc.
1968
Fernald House (Orlando Marcellus Fernald)
Addition: $6,200
Designed by: Ralph W. Iacuessa
1969
Clark Hall
Renovation: $350,000
Architect: Lockwood Greene Co.
1969
Lansing Chapman Rink
Total enclosure and connecting building: $900,000
Engineer: Lockwood Greene Co.
1969
Sprinkler System
Agard, Bascom, Brooks, Fort Hoosac, Perry, Spencer, Tyler, Wood: $160,000
Engineer: Automatic Sprinkler Corp.
1969
Taconic Golf Club
Alteration: $35,000
Architect: William Kirby, Jr.
1970
Heating Plant
Addition and alteration (oil storage facility): $615,000
Engineer/Architect: Lockwood Greene Co.
1970
Lasell Gym – Women’s Athletic Facility
Design and Construction: $125,000
Architect: Lockwood Greene Co.
1970
John A. Shaw Boathouse
Architect: Jonathan Rose ’63
1970
Herbert S. Towne Field House (Herbert S. Towne ’21)
Design and Construction : $1,000,000
Engineer: Lockwood Greene Co.
1971 Baxter Hall – Radio Station – WCFM
1971
Mission Park Residential Houses
(Samuel John Mills 1809; Samuel Chapman Armstrong 1862; James Bissett Pratt 1898; Tyler Dennett 1904)
Design and Construction: $5,415,000
Architect: Mitchell-Giurgola Associates
1972
Dodd Annex (formerly Williams Inn)
Williams Inn Annex #3: $39,000
Designed by: Peter P. Welanetz, P.E.
1972
Morgan Hall
Renovation: $759,000
Architect: Winthrop M. Wassenar, P.E.
1972
Tyler Annex
Cost: $532,000
Architect: Unitec Inc. and Gary Lindstrom and Associates
1973
Chaffee Tennis House (Clarence Chaffee)
Design and Construction: $13,000
Designed by: Peter P. Welanetz, P.E.
1975
Sawyer Library (John Edward Sawyer ’39)
Design and Constructioni : $4,916,000
Architect: Harry Weese and Associates
1976
Service Building
Storage building: $17,000
Fabricator: Agway Inc.
1976-77
Stetson Hall
Renovation: $744,000
Architect: Harry Weese and Associates
1977
Chapin Hall
Renovation Phase I: $400,000
Architect: Cambridge Seven Associates, Inc.
1978
Bernhard Music Center (Arnold Bernhard ’25)
Brooks-Rogers Recital Hall (Mrs. Belvidere Brooks and Alan Rogers ’09)
Presser Choral Hall (Theodore Presser)
Phase II: $2,300,000
Architect: Cambridge Seven Associates, Inc.
1978
Garfield House (Henry Augustus Garfield 1885)
Renovation: $501,000
Architect: Gary Lindstrom and Associates
1979
Fire Protection Safety Systems
Cost: $104,750
1982
Herbert S. Towne Field House
Storage Addition: $35,670
Architect: David J. Westall, R.A.
1983
Adams Memorial Theatre
Down stage addition: $937,000
Architect: Cambridge Seven Associates, Inc.
1983
Dimension Phone System
Purchase and installation: $42,000
1983
Faculty House/Alumni Center
Addition: $1,245,000
Architect: Cambridge Seven Associates, Inc.
1983
Lawrence Hall – Williams College Museum of Art
Phase I: $4,980,000
Architect: Moore, Grover and Harper
1984
Baxter Hall
Phase I: $916,000
Architect: John Jordan, P.A.
1984
Heating Plant
Economizer: $127,700
Engineer: Pope Engineers
1984
Jesup Hall (Morris Ketchum Jesup)
Computer Center: $1,960,500
Architect: John Jordan, P.A.
1984
Mather House
Admissions Office Renovation: $114,500
Architect: David J. Westall, R.A.
1984
Mears House
Alumni/Development Offices: $477,300
Architect: John Jordan, P.A.
1984
Spring Street
Parking Lot: $173,350Architect: William Kirby, Jr.
1984
Stetson Hall – Roper Center
Career Counseling: $113,000
Architect: John Jordan, P.A.
1984
Thompson Chemistry Lab
Lab renovations – lower level west: $189,480
1984
Weston Field Press Box
Replacement: $95,000
Architect: David J. Westall, R.A.
1985
Baxter Hall
Phase II: $515,000
Architect: John Jordan, P.A.
1985
Bronfman Science Center
Basement Classrooms: $501,000
Architect: Hallock Architects, Inc.
1985
Chandler Commercial Building (John Wesley Chandler)
Retail/office building: $700,000
Architect: Cambridge Seven Associates, Inc.
1985
Faculty Art Studio/College Garage
Renovation: $330,000
Architect: Burr and McCallum Architects
1985
President’s House
Renovation: $170,300
1985
Service Building
Garage: $257,000
Architect: David J. Westall, R.A.
1985
Taconic Golf Club
Addition – Women’s Locker Room: $200,000
Architect: William Kirby, Jr.
1985
Mary Clark Thompson Center for Health Services
Cost: $721,000
Architect: David J. Westall, R.A.
1985
Thompson Physics Lab
Renovation: $895,500
Architect: Hallock Architects, Inc.
1985
Williams Oxford
Improvements: $607,000
Architect: The Oxford Architects Partnership
1986
Cole Field House
Renovation: $105,000
Architect: David J. Westall, R.A.
1986
Lawrence Hall – Williams College Museum of Art
Phase II: $2,571,500
Architect: Centerbrook Architects, Inc.
1986
Thompson Hall
Conversion to Dorm: $377,000
Architect: Hallock Architects, Inc.
1986
Williams Club, New York
Cost: $520,500
1987
John Wesley Chandler Athletic Facility and Lasell Renovations
Feasibility Study: $35,000
Design and Construction : $16,282,000
Retail Space/Athletic Offices: $700,000
Architect: Cambridge Seven Associates, Inc.
General Contractor: Fontaine Brothers
1987
Mears West
Renovated for Alumni Office expansion: $556,400
Architect: John Jordan, P.A.
1987
Weston Field
New Plansky Track (Tony Plansky) and relocate baseball field: $1,243,100Architect: Saratoga Associates
1987-92
Thompson Biology Lab
1987-88 Lab Renovation – Phase I: $273,985
1988-89 Lab Renovation – Phase II: $204,680
1988-89 Lab Renovation – Phase III: $ 70,150
1991-92 Lab Renovation – Phase IV: $ 64,226
1988
Grundy’s Garage
Purchased: $445,000
1988
Lasell Gym
Renovation: $3,000,000
Architect: Cambridge Seven Associates, Inc.
1989
Clark Hall (Edward Clark 1831)
Geology Lab Renovation: $117,913
1989
Fayerweather Hall
Renovation: $400,000
1989
Heating Plant
Co-generation: $340,900
Architect: vanZelm, Heywood, & Shadford
1989
Hopkins Hall
Renovations and new addition: $9,300,000
Architect: Architectural Resources Cambridge, Inc.
General Contractor: Barry Bette and Led Duke
1989
Weston Language Center
Phases I-IV: $1,037,125
Architect: William Kirby, Jr. & David J. Westall, R.A.
1990
Computer Network Equipment
Cost: $2,665,050
1990
Jenness House (Arthur Freeman Jenness)
Multicultural Center
Cost: $27,300
1990
Jewish Religious Center
Design and Construction: $1,457,450
Architect: Herbert Newman Associates AIA, P.C.
General Contractor: GSS Construction
1990-91
Mission Park
Renovations – Phases I-III: $2,885,000
1991
East College
Renovation: $330,412
1991
Sawyer Library Automation
Cost: $650,000
1991
Pine Cobble Faculty Housing Subdivision
Cost: $7,612,000
1991
Williams Oxford
Renovation: $75,000
1992
Danforth Block
Renovation: $815,798
1992
Morgan Hall
Renovations: $1,572,568
Architect: Weese Langley Weese
1993
Currier Hall
Renovation and refurbishment: $685,082
1993
Dodd House (Cyrus Morris Dodd 1855)
Renovation and refurbishment: $886,702
1993
Poker Flats (formerly Stetson Road Apartments)
Conversion to student housing: $1,600,000
Architect: Einhorn Yaffee Prescott
1993
Sawyer/Hopkins Hall
Air Conditioning: $745,942
1993
Sawyer Library
Renovation: $3,200,000
Architect: Weese Langley Weese
1994
Bascom House (John Bascom 1849)
Renovation: $537,846
1994
Fitch House (Ebenezer Fitch)
Renovation: $944,270
1994
Perry House (Arthur Latham Perry 1852)
Renovation: $968,874
1994
Spencer House (Philip Spencer)
Renovation: $845,046
Architect: EDM
1995
Kellogg House – Center for Environmental Studies (Ebenezer Kellogg)
Matt Cole Library addition: $350,729
Architect: Ann Beha Associates
1996
Center for Development Economics
Renovation: $1,239,862
1996
Goodrich House (Frank Goodrich)
Renovation: $141,168
Architect: Christopher Williams
1996
WLS Spencer Studio Art Building (Wadsworth Littleford Stegeman)
Design and Construction: $5,606,660
Architect: Carlos Jiminez Associates/Cambridge Seven Associates
1996
Williams Hall/Sage Hall
Renovation: $9,797,306
Architect: Einhorn Yaffee Prescott
General Contractor: Barry Bette and Led Duke
1997
Cole Field House
Renovation: $1,727,923
Additional Funding: $247,000
Architect: Baron & Hammer
1997
Droppers House (Garrett Droppers)
Renovation/Addition: $52,071
Architect: Christopher Williams
1997
Griffin Hall
Phases I-III: $2,750,000
Architect: Childs Bertman Tseckares
1997
Simon Squash Courts (Carol Girard and Cynthia Stewart Simon Squash Center)
Renovation: $3,800,000
Architect: Wurmfeld Associates
1997
Susan Hopkins House (Susan Sedgwick Hopkins)
Renovation: $160,094
Additional Funding: $67,000
1997
Woodbridge House
Renovation: $244,940
Additional Funding: $117,000
1998
Clarence Chaffee Tennis House
Torrence M. Hunt ’44 Tournament Courts
Rebuilt tennis house and court improvements: $279,668
Todd Hunt Tennis Center: $167,694
Architect: Christopher Williams
1998
Doughty House (William H. Doughty Jr. 1898)
Renovation and refurbishment: $362,973
1998
Mears House
Renovation/AC: $220,339
1998
Seeley House (Charles F. Seeley)
Restoration: $54,563
1998
Thompson Hall Dorm
Renovation: $1,121,774
Architect: Thomas Bartels
1999
Class of 1937 House/Children’s Center
Renovation: $395,187
Architect: Dignard Architectural Services
1999
East/Fayerweather
Single Sex Bathrooms: $532,462
Architect: H.P. Rovinelli Architects
1999
Fernald House
Renovation/Code Issues: $209,665
1999
Ft. Hoosac Renovation
Renovation: $167,222
Architect: Bob Holdridge
1999
Goodrich Hall
Conversion to Student Activity Center: $2,430,251
Architect: Bruner/Cott Associates
Refurbish and install Tenney Window: $12,150
Cummings Studios
1999
Greylock Housing
Code Deficiencies and Network Cabling: $244,000
1999
Mt. Hope/Elm Tree House
Renovation/Code Work: $538,966
Architect: Einhorn Yaffee Prescott
1999
Tyler House-Phase I
Renovation: $50,000
1999
West College
Renovation: $850,074
Architect: Primary Group
1999
Wood House (Hamilton B. Wood ’10)
Renovation: $1,047,897
Architect: Primary Group
2000
Brooks House
Renovation: $933,559
Architect: Thomas Bartels
2000
Garfield House
Renovation: $313,515
Architect: Thomas Bartels
2000
Greylock Housing-Bryant/Mark Hopkins
Renovation: $2,500,000
Architect: Black River Design
Contractor: MLB
2000
Lambert House (Anna Elizabeth Lambert)
Renovation: $105,862
Architect: Mollenburg and Betz
2000
Milham House (Willis I. Milham 1894)
Renovation: $244,611
2000
Weston Field Grandstand
Relocation and Renovation: $254,745
Architect: Christopher Williams
2001
The Carl W. Vogt ’58 House (formerly 63 Park Street)
Renovation: $1,594,717
Sitework: $150,000
Architect: Mark Hammer
2001
American Legion
New Construction: $791,205
Architect: Hill Architects
2001
Chaffee Tennis House
Todd Hunt Tennis Center
Construction of Additional Courts: $167,694
2001
Dodd Dining Renovation
Renovation: $1,045,705
Architect: Centerline
General Contractor: Cutler
2001
Greylock Housing-Carter/Gladden
Renovation: $3,268,596
Architect: Black River Design
Contractor: MLB
2001
Heating Plant Upgrade
Upgrade: $969,859
2001
Hubbell House (Mary Hubbell)
Renovation: $276,543
Architect: David Westall
General Contractor: Renau
2001
Parsons House (Eben B. Parsons 1859)
Renovation: $245,827
Architect: David Westall
2001
Tyler Annex Renovation
Renovation: $966,457
Architect and General Contractor: Breadloaf
2001
Tyler House Renovation-Phase II
Renovation: $1,282,174
Architect and General Contractor: Breadloaf
2001
Morley Science Laboratories and Schow Science Library
Edward William Morley/Nan and Howard Schow
Science Library and Thompson Labs Renovations: $47,827,700
Architect: Einhorn Yaffee Prescott/Zimmer Gunsul Frasca
General Contractor: Gilbane Building Company
2002
Alumni House/The Log Renovation
Renovation: $104,874
Architect: David Westall
General Contractor: Renau
2002
Heating Plant Upgrade
Boiler 3 Replacement: $3,300,000Electrical Cogeneration: $2,700,000
Auxiliary Systems: $693,889
Architect: Childs Bertman Tseckares
General Contractor: Pizzagalli
2002
Mather House
Relocation to Stetson Court and Renovation: $497,187
Architect: Thomas Bartels
General Contractor: Renau
2002
Mission Park Dining Renovation Phase I
Renovation: $3,061,876
Architect: Centerline
General Contractor: Breadloaf
2002
Thompson Hall Student Parking Lot
Design and Construction: $300,339
Architect: Halvorson
2003
Bascom House Renovation
Conversion to Admissions: $408,622
Architect: EDM
General Contractor: Renau
2003
Brooks B Parking Lot Expansion
Expansion: $166,604
Engineer: Vince Guntlow
Contractor: Petricca
2003
Lansing Chapman Rink Renovation
Renovation: $922,021
Dasher Boards: $167,938
Engineer: RFS
Contractor: American Refrigeration
2003
MSL Neuroscience Lab 022
Animal Lab Conversion: $254,012
Paul Solomon’s Office: $19,394
Architect: Einhorn Yaffee Prescott
General Contractor: Tierney
2003
Parking Garage
Design: $400,000
Sitework and Construction: $5,393,158
Architect: William Rawn Associates
General Contractor: Barr & Barr
2003-04
High Voltage Distribution System Expansion
Expansion: $349,974
Electrical System Repairs: $775,000
Engineering Consultant: vanZelm, Heywood and Shadford
General Contractor: Pizzagalli
2003-04
Mission Park Renovation Phase II
Student Life Improvements: $1,835,376
Network Upgrade: $650,000
Life Safety and ADA: $3,283,919
Architect: Centerline
General Contractor: Breadloaf
2003-04
33 Tenison Road, Cambridge, England
Purchase and Renovation: $1,142,155
2004
Baxter Hall
Demolished 10/2004
2004
Central Chilled Water Plant
Planning, Site Work and Preliminary Design: $250,000
Construction: $4,180,587
Architect: William Rawn Associates
General Contractor: Barr & Barr
2004
Chadbourne House Renovation (Paul Ansel Chadbourne)
Design: $50,000
Renovation: $497,798
Architect: EDM
General Contractor: Renau
2004
Renzie Lamb Synthetic Turf Field
Cost: $1,993,460
Architect/General Contractor: Clark Companies
2004
New Baseball Field-Cole Field
Bobby Coombs Baseball Field: $510,814
2004
North Campus Utilities Phase I
Cost: $3,500,000
Chilled Water to Chapin: $350,000
Engineer: VanZelm Heywood & Shadford
General Contractor: Breadloaf
2004
Southworth School Renovation
Acquisition: $400,000
Design and Conversion: $5,504,500
Architect: Black River Design
General Contractor: Engelberth
2004-2012
Stetson/Sawyer Project
Programming: $1,000,000
Design: $2,000,000
Design: $2,000,000
Design Completion and Construction: $123,000,000
Architect: Bohlin Cywinski Jackson
General Contractor: Barr & Barr
2004
Thompson Memorial Chapel
Centennial Celebration Restoration – $414,424
Windows-Lead Replacement – $106,619
Architect: Ryan-Biggs
General Contractor: Allegrone
2004-05
Prospect House Renovation Phase I and II
Student Life Improvements: $1,953,089
Renovation: $3,473,180
Radio Station: $423,390
Architect: Black River Design
General Contractor: MLB
2005
AMT Renovation
Improvements: $1,762,027Renovation: $3,200,173
Architect: William Rawn Associates
General Contractor: Barr & Barr
2005
B&L Building
Acquisition: $300,000
Design, Demolition and Construction: $3,401,104
Additional Funding: $670,000
Architect: Burr & McCallum
General Contractor: Tierney
2005
Class of ’62 Center for Theatre and Dance
Project Cost: $52,194,310
Design and Construction: 50,300,000
Additional funding: $1,500,000
Theater Consultant: Robert Davis, Inc.
Architect: William Rawn Associates
General Contractor: Barr & Barr
2005
Eph’s Monument and Gravesite Restoration
Restoration: $323,487
Architect: Elmore Design
General Contractor: E.T. O’Connor
2006
Agard Renovation
Design: $100,000
Renovation: $1,899,349
Architect: Woodward, Connor, Gillies , Seleman
General Contractor: Renau
2006
Fernald House
Demolished 9/12/06
2006
North Campus Utilities Phase II
Cost: $2,777,039
Engineer: VanZelm, Heywood and Shadford
General Contractor: Barr & Barr
2006
Morgan Hall Renovation
Design: $200,000
Construction: $6,089,058
Architect: Black River Design
General Contractor: Barr & Barr
2006 Wireless Implementation: $572,427
2007
Children’s Center
Expansion Feasibility Analysis: $34,992
Site Selection: $75,000
Design: $370,575
Design and Construction: $5,775,000
Architect: D.W. Arthur Associates Architects
Contractor: Engleberth
2007
Fitch House Cornice Repair
Design: $60,000
Construction: $1,109,000
Architect: MCWB/Ryan-Biggs
General Contractor: Allegrone
2007
Paresky Center (David Paresky ’60 and Linda Paresky)
Programming and Pre-design: $1,000,000
Design Consultants: $2,500,000
Construction: $35,200,000
Contaminated Soil Clean-Up:
Additional Funding – $8,500,000
Architect: The Polshek Partnership
General Contractor: Breadloaf
2008
Athletic Complex
Master Planning: $200,000
2008
Garfield
Renovation design: $200,000
2008
Goodrich Hall
Great Hall Structural Repair: $400,000
2008
Kellogg House
Relocation and Renovation
2007-08
Off-Site Storage Building
Simonds Road Property Purchase and Development: $2,350,000
General Contractor: Barr & Barr
2008-09
Weston Field Improvements
Design and Construction: $17,600,000
Architect: Moser Pilon Nelson/Clark Companies
General Contractor: Daniel O’Connell’s Sons, Inc.
2008
Weston Language Center
Renovation
2009
Campus Wide
Steam Metering (phase 2 of 2): $813,704
2010
Parking Garage
North Campus Central Chiller Plant: $1,446,196
2011
Kellogg House
Relocation to Mission Park Drive: $750,000
2013
Bernhard Music Center
Fire Protection: $845,075
2013
Bronfman Science Center
BSC 064/065 Lab Renovations: $131,667
2013
Brooks/Perry/Dodd
Brooks/Perry/Dodd Transformer: $546,020
2013
Campus
Campus Arc Flash Hazard Mitigation Plan: $224,593
Campus Mechanical Insulation Retrofit: $155,945
Campus Fiber Infrastructure Upgrades: $650,000
SW Campus Sector Plan: $400,000
Fac Rental Housing Chimney Repair: $138,762
Campus Sewer Replacement N Campus: $98,012
2013
Cole Field
Cole Field Portable Video Tower: $15,857
Resod Field I (Womens Practice Field): $132,940
2013
CTD
CTD Auditorium handrailings: $113,896
2013
East College
East College ADA Improvements
2013
Faculty House
Faculty Club Retro Commissioning: $2,400
2013
Fort Hoosac
Ft Hoosac Program & Space Stdy: $31,002
2013
Heating Plant
#6 Fuel Oil Storage for Heating: $450,265
2013
Hollander Hall
Hollander Hall, Faculty Lounge: $4,620
2013
Hopkins Hall
Security Central Station Ugrades: $500,117
Hopkins Hall Sprinkler Line Repair: $30,531
2013
Jesup Hall
Jesup Data Center Assess Study: $51,719
2013
Kellog House
Environmental Center Project: $5,205,158
Design Team: Black River Design
Construction Team: Consigli
2013
Lansing Rink
Lansing Chapman Rink PA system: $63,860
Chapman Rink Roof Deferred Maintenance: $80,000
2013
Lasell Gymnasium, East College, Sloan House
Lasell East-Pres House Roof Repair: $67,054
2013
Lawrence Hall
Lawrence Hall Faculty Office Renovations: $79,050
2013
Miller House
Miller House – 2nd Floor Modifications: $13,929
2013
MSL
MSL Chiller #3 Emergency Replacement: $300,031
2013
Paresky
Paresky chair & table upgrades: $66,393
2013
Science Quad
Science Quad Walkway Repairs: $52,075
2013
Shaw Boathouse
Shaw Boat House Repairs: $64,982
2013
Simon Squash Courts
Squash Courts, refinishing courts: $10,900
2013
Spencer Art
Spencer Studio Art Roof Repair: $638,191
Spencer Studio Arts 216 Lighting Upgrades: $675
2013
TPL
TPL Chalkboards: $17,961
2013
Vogt House
Vogt House Study: $50,000
Vogt Hse-Chilled Water Line Extension: $75,229
2013
Weston Field
Weston Athletic Complex Project: $23,672,699
Design Team: CHA
Construction Team: Whiting Turner
2014
B&L
B&L 2nd Floor Build-out Rm 201: $159,737
2014
Beals House
Beals House Renovation: $174,276
2014
Bernhard Music Center
Bernhard Presser Choral: $39,900
Bernhard portico roof replacement: $67,000
2014
Bronfman Science Center
Bronfman condition assessment: $436,587
BSC 019 lab renovation: $34,131
BSC 358,361&363 Improvements: $103,740
2014
Brooks House
Center for Learning in Action: $61,879
2014
Campus
Campus Exterior Lighting Retrofits: $149,995
2014
Chandler Athletic
Chandler Pool HVAC&DDC Upgrades: $207,356
2014
Clark Hall
Clark Hall-GeoSci Countertops: $26,471
2014
Cole Field
Cole Field-Game Centers: $60,336
2014
Danforth Block
Danforth-Hockey Rink Parking Lot Paving: $401,218
2014
Faculty House
Faculty Hse Electrical Upgrade: $98,334
2014
Grundy’s Garage
Grundy’s Garage space utilization study: $2,001
Grudy Art Studio Build Out: $146,950
2014
Harper House/Mather House
Harper/Mather House Feasibility Study: $34,265
2014
Heating Plant
#6 Fuel Oil Storage Phase 2: $898,304
Heating Plant – CHP Assessment: $82,000
2014
Jesup Hall
Jesup Hall Window Replacement: $148,720
2014
Lawrence Hall
WCMA small offices reconfiguration: $124,440
WCMA condition assessment: $214,425
2014
Mears House
Mears House Improvements: $531,429
2014
MSL
Renoations to rooms 124, 126 and 128: $42,614
2014
Paresky
Retro-commissioning: $58,213
2014
Parking Garage
Exterior Lighting: $63,778
2014
South House
South House Mechanical & Electrical Upgrades: $90,832
2014
Spencer Art
Spencer Studio Art – Sloan House Steamline Repair: $260,345
Sculpture Studio Repair & Renovation: $20,006
Spencr Studio Art HVAC: $96,770
2014
Spencer House
Spencer House Envelope Renovation Phase I: $404,148
2014
TBL
Office 103 Renovations: $14,926
2014
The Log
The Log Revitalization Program: $70,370
2014
Unified Science Center
Renovations to:
MSL 257
TCL 210
BSC 227,228,229
Cost: $208,454
2015
Athletics Buildings
General Painting: $159,041
2015
American Legion
Legion Classroom upfit: $49,346
2015
Bernhard Music Center
Environmental Improvements: $351,607
2015
Campus
Electric Vehicle Chrarge Station: $8,501
2015
Chandler Athletic
Pool HVAC & DDC Replacement: $1,012,867
2015
Chandler Commercial
Chandler Commercial HVAC: $12,600
2015
Cole Field
Resod men’s & women’s soccer fields: $130,238
2015
Coles Grove Road
Coles Grove Road Repaving: $210,672
2015
Faculty House
Elevator Modernization: $58,413
2015
Lasell Gymnasium
Lasell Clock Renovation: $91,500
2015
Mason House
Mason house repairs: $11,946
2015
Patrie House
Patrie Hse-Energy Upgrade: $65,932
2015
Shool House
School House Renovation: $26,955
2015
Spencer House
Spencer House Envelope Renovation: $11,705
2015
Tyler House
Drive & Parking Repaving: $161,680
2015
Unified Science Center
Various Lab Renovations: $151,608
2016
Adams Block
Adams Block Roof Replacement: $95,648
2016
Athletic Storage Building
Athletic Storage Building: $80,000
2016
B&G
Facilities Roof: $245,873
2016
B&G North
Art Studio build out for Faculty: $300,000
2016
Bascom House
Bascom House Renovation: $269,209
2016
Bernhard Music Center
Replace Transformer-Bernhard & Chapin: $190,400
2016
Bronfman Science Center
Bronfman Science Center Abatement: $2,338,806
Contractor: American Environmental
2016
Brooks House
Brooks Parking Lot Connector Paving: $139,206
2016
Campus
Hoxsey St. Widening: $127,656
Replace Lines – Lasell/Hopkins: $225,000
Medium Voltage Expansion – SE: $965,520
Campus-Wide Masonry Mortar Study: $132,000
2016
Chaffee Tennis House
Resurfacing Competition Courts: $2,350,000
2016
CTD
CTD Main & Center Stage Elevator: $250,000
Sound Transmission in CTD: $50,000
2016
Currier Hall
Retaining Wall-Currier Fitch: $80,000
2016
East College
East College Main Electrical: $350,000
2016
Faculty House
Faculty House-Replace Dining Room Chairs: $40,000
2016
Fellows Hall
Fellows Hall Construction Project: $15,009,861
Design Team: PBDW Architects
Construction Team: Cummings Construction
2016
Goodrich Hall
Goodrich Hall Envelope Restoration Project: $4,959,000
Design Team: Christopher Williams Architects
Construction Team: Allegrone
2016
Goodrich House Hubbell House
Goodrich & Hubbell Waterproofing: $50,000
2016
Heating Plant
Condensate piping replacement: $250,000
2016
Hopkins Hall
CSS Interior Renovations: $375,000
Elevator Modifications: $100,000
Dean’s Office Renovations: $225,000
Hopkins Hall Modfications: $50,000
2016
Hopper Science Center
Enabling Cost: $5,342,548
Construction Cost: $81,360,435
Design Team: Payette Architects
Construction Team: Consigli
2016
JRC
Interior Modifications: $172,500
2016
Lawrence Hall
WCMA Security Pulpit Renovation: $10,000
WCMA Print Room Remodel: $65,000
2016
Mears House
Career Center Office – M 208 Remodel: $200,000
2016
Mission Park
Mission Park Roof Replacement: $950,000
2016
Modular Facilities Classrooms
Modular Facilitiy Clasrooms: $1,643,783
2016
Modular Facilities Offices
Modular Facility Offices: $4,500,000
2016
Morey & Stocking Houses
Morey & Stocking Renovations: $145,000
2016
MSL
Replace Morley Chiller #2: $380,000
2016
New Museum
ARTS Programming & Space Utilization Study: $701,123
2016
Parking Garage
Parking Garage Access Road Improvements: $300,000
2016 Chilled Water Upgrades: $290,600
2016
Saint Anthony’s Hall
Saint Anthony’s Hall Renovation: $16,737,617
Design Team: Centerline Architects
Construction Team: Engelberth Construction
2016
Schow Library
Schow Library Classroom Renovations: $1,750,592
Computer Science Gaming Classroom: $153,849
2016
Sloan House
President’s House Walkway: $22,855
2016
Southworth School
Southworth School-Elevator Modernization: $65,000
2016
Spencer House
Spencer House Envelope Restoration: $200,000
2016
TBL
Computer Science Labratory Renovation: $550,000
2016
TCL
Thompson Chemistry Lab Entryway Reconfiguration: $270,164
TCL/TPL Window Replacement: $24,000
2016
The Bookstore
Williams College Bookstore: $10,500,000
Design Team: Cambridge Seven Architects
Construction Team: Engelberth Construction
2016
Town Field House
Towne Fieldhouse Facility Condition Assessment: $150,000
2016
Unified Science Center
Thompson Sidewalk Replacement: $275,000
ECO Cafe Renovation: $106,000
Lab renovation-new Physicist: $53,077
TBD-New lab space: $108,976
2016
Wachenheim Science Center
North Building Construction $93,991,045
Design Team: Payette Architects
Construction Team: Barr & Barr
2017
TPL
Physicist’s Lab Reno FY17: $43,485
2017
B&G
Facilities-Heating Improvements: $300,000
2017
Campus
South Campus Drainage Improvements – Phase 1: $315,000
2017
Chandler Athletic
Chandler faculty offices: $187,850
2017
Chadbourne House
Chadbourne Accessibility Renovations: $800,000
2017
Chapin Hall
Chapin Hall Canopy and AV: $1,000,000
Chapin Hall roof Replacement: $635,000
2017
Cole Field House
Cole Field House-Elevator: $75,000
2017
CTD
CTD fire curtains replacement: $41,515
CTD Control Conversion: $75,000
CTD Assistive Listening System: $25,000
2017
Danforth Block
Danforth Block roof: $146,000
2017
Doughty House
Doughty Accessibility Renovations: $1,000,000
2017
Facilities Agway
Facilities Storage Facility: $1,550,000
2017
Faculty House
Faculty Club Chair Replacement F17: $40,000
2017
Fitch Hall
Fitch Heat Distribution: $303,209
2017
Frosh Quad
Frosh Quad Renovation: $1,450,000
Design Team:
2017
Garfield House
Garfield House Renovation: $12,495,000
Design Team: SGA
Construction Team: Engleberth Construction
2017
Greylock Dining
Greylock Dining code review: $9,000
2017
Lawrence Hall
WCMA/Lawrence 712 Art: $60,000
2017
Mission Park
Mission Disaster Recovery: $150,000
Mission common areas: $149,244
2017
MSL
MSL 032/034 reconfiguration: $55,000
2017
Mount Hope
Mt Hope Bridge replacement: $1,011,842
Design Build Team: J.H. Maxymillian
2017
Oxford
Oxford 145 Banbury Refurbishment: $400,000
2017
Rice House
Rice House Structural Renovation: $91,000
2017
Rosenburg Center
Rosenburg Center Repairs: $56,000
2017
Sage Hall
Sage basement dehumidification: $11,000
2017
TCL
Chemistry Lab vacuum systems: $53,000
2017
Thompson Health
Thompson Health reconfiguration: $28,000
2017
Water Street Books
Water Street Books Study-Alterations: $14,000
2017
WCCC
WCCC Expansion Project: $660,000
2017
Weston Hall
Weston Hall #217 Alterations: $30,000
Weston Hall West Stairs: $19,500
2018
Campus
Christmas Brook Culvert Project: $9,622,054
Christmas Brook Restoration: $49,840
Drainage pipe in Latham Street: $71,589
Public parking lot drainage: $8,589,169
2018
CTD
CTD scene shop trap door: $35,000
2018
Driscoll Dining
Driscoll Lower Tables & Chairs: $25,000
Driscoll Code Improvements: $2,554,642
Design Team: EDM
Construction Team: Wright Builders
2018
Faculty House
Faculty Club Chair Replacement: $40,000
2018
Greylock Dining
Greylock Dance Studio Project: $200,000
2018
Grundy’s Garage
Grundy’s Garage Artists’ Studio: $61,254
2018
Lawrence Hall
WCMA FY19 CIR Projects: $2,823,456
WCMA Renewal Plan: $212,804
WCMA Flooring 54 and Kroh Galleries: $111,130
WCMA New Director’s Office: $2,611
2018
LSF
LSF Expansion: $5,500,000
2018
Mission Park
Mission Park Furniture Replacement: $150,000
2018
Mount Hope
Mt. Hope retaining wall reconstruction: $563,922
2018
Oxford
Oxford 145 Banbury Refubishments: $145,000
2018
Pond House
Hewat House Renovation: $2,745,000
Design Team: EDM
Construction Team: Wright Builders
2018
Prospect House
Prospect Maintenance Summer 22: $225,000
2018
Sloan House
President’s House Improvements: $2,350,000
2018
Spencer House
Spencer House envlope restoration phases 2&3: $1,637,420
2018
TCL
Thompson Chemistry Lab Upgrade: $170,000
2018
The Williams Inn
The Williams Inn $48,600,000
Design Team: Cambridge Seven
Construction Team: Engelberth Construction
2019
Lawrence Hall
Art Projection Booths Removal: $450,000
2019
Campus
Weston/Perry Steam Line Replacement: $300,000
Campus Landscape Study: $360,000
2019
Cole Field
Cole Field Dugouts Replacement: $48,605
2019
CTD
CTD door replacement: $32,520
2019
Currier Hall
Currier roof and masonry repair: $400,000
2019
Faculty House
Faculty Club chair replacement: $40,000
2019
Fayeweather Hall
Fayeweather roof replacement: $250,000
2019
Fitch Hall
Fitch masonry repairs: $179,282
2019
Fort Hoosac
Fort Bradshaw renovation: $11,500,000
Design Build Team: A/Z Corporation
2019
Grundy’s Garage
Grundy’s art studio renovations: $1,032,844
2019
Lansing Rink
Lansing Rink boards: $110,000
2019
Lasell Gymnasium
Athletic complex — Locker room Study: $150,000
2019
McGuiness House
McGuiness House code improvements: $243,106
2019
Morgan Hall
Morgan Hall Roof Replacement: $1,300,000
2019
Prospect House
Key & Lock replacement: $308,795
2019
Sawyer Library
Sawyer library S2 security alarm improvements: $214,290
2019
Thompson Health
Thompson Health Center renovations: $600,000
2019
Towne Field House
Towne Field House track replacement: $907,349
2019
TPL
TPL roof replacement: $180,000
2019
Weston Field
Wall-ball Wall: $72,727
2019
Williams & Sage
Williams and Sage floor repair: $34,464
2020
AMT
AMT lighting system replacement: $814,723
2020
Bernhard Music Center
Bernhard Hall-renovate music rooms: $45,000
2020
Brooks Hall
Brooks Hall gutter replacement: $160,000
2020
Chandler Athletic
Athletics-furniture and workstations: $120,000
Chandler varsity swim locker room renovations: $200,000
2020
CTD
CTD Mainstage sound system repair: $270,101
CTD projector upgrade: $22,146
CTD Mainstage counterweights: $22,689
CTD power door operators: $68,604
2020
Faculty House
Faculty House critical repairs: $160,000
2020
Jesup Hall
Jesup Hall – UPS & ATS Replace: $250,000
2020
JRC
JRC millwork improvements: $56,415
2020
Lansing Rink
Hockey Rink Mats: $250,000
2020
Paresky
Paresky south patio replacement: $87,567
2020
Sawyer Library
Stetson Reading Room doors: $40,000
2020
Spencer Art
Spencer Studio Art printmaking: $131,824
2020
Thompson Chapel
Lower chapel parking lot repaving: $202,400
2020
Vogt House
Vogt roof and gutter replacement: $310,000
2020
WCCC
WCCC Infant Program Expansion: $340,971
Children’s Center parking expansion: $75,000
2020
Williams & Sage Halls
Williams and Sage hall doors: $160,000
2021
Campus
Area Coordinator Apartments Review: $90,180
2021
Chandler Athletic Center
Chandler Plaza Snow Melt System: $50,000
2021
Chapin Hall
Chapin Hall Railing Replacement: $7,895
2021
Doughty House
Doughty House Roof Replacement: $388,847
2021
Greylock Quad
Greylock Quad Electrical Improvements: $1,525,688
2021
Grundy’s Garage
Grundy’s Garage Roof Replacement: $143,426
2021
Heating Plant
Heating Plant Control Systems: $165,285
2021
Lasell Gymnasium
Lasell Gym Handrails: $25,000
2021
Mission Park
Mission Park Walk-in Refrigeration Upgrades: $176,901
2021
Paresky
Paresky Refrigerant Lines: $233,346
Whitman’s Servery Reconfiguration: $46,991
2021
Saint Anthony’s Hall
Saint Anthony Hall Sprinkler System: $62,000
2021
Simon Squash Courts
Simon Squash Gutter Replacement $127,601
2021
WCCC
Children’s Center Interior Painting: $65,100
WCCC Modular Purchase: $160,500
2022
Bernhard Music Center
Shainman Renovations: $35,000
2022
CTD
CTD 283 dance studio lighting upgrades: $180,000
2022
Lawrence Hall
Lawrence Art Restroom Updates: $110,000
2022
MSL
MSL 134 Greenhouse Curtains: $46,600
2022
Perry House
Perry House Drainage Study: $150,000
2022
Pond House
North Side Lot Paving: $200,000
Various Improvements: $75,000
2022
Sawyer Library
Collection Management Renovations: $85,000
2022
Spencer Art
Spencer 216/Video Equipment Closet Renovations: $36,764
2022
Unified Science Center
Thompson and Morley Hydration Stations: $30,000
2022
Weston Hall
Weston Hall 3rd Floor Alterations: $132,783