1791-93 | West College (West Township original name of Williamstown) Remodeled 1855 – central door out and north and south doors cut in. Remodeled 1904 and north door sealed up. |
1801 | President’s House (Samuel Sloan House) Front part only; woodwork imported from Boston |
1828 | Griffin Hall (Edward Dorr Griffin) Originally had double entrance and stood near Main St. Built by President Griffin at a cost of $6,000; served as chapel until 1859 (when Goodrich Hall was built), library built 1847, and lecture room; moved to northeast in 1904 and remodeled. The building was originally called “the brick chapel,” and was named Griffin Hall in 1859. Architect: Harding and Seaver |
1837 | Hopkins Observatory (Albert Hopkins) Built by Professor Albert Hopkins and students near East College. Moved in the 1850’s to the south end of the Berkshire Quad. In 1962, it was moved to the north end of the Berkshire Quad.Cost: $2,075 |
1842 | East College Rebuilt – the original building of 1798 burned in 1841. In 1907 larger doorways added. Designed by J.S. Oakman ’99. |
1842 | South College (Fayerweather Hall) Gold Coast addition to south in 1905 and the building renamed Fayerweather. Architect: Allen & Collens |
1846 | Lawrence Hall (Amos Lawrence) Octagonal Library, cost $7,000. Architect: Thomas Tefft, (Providence). East and west wings 1890; additions at rear in 1915, 1926, 1938. Became Art Museum in 1926. |
1859 | Goodrich Hall (John Zaccheus Goodrich) Chapel and Alumni Hall – shift to stone (local dolomite) and to Gothic. Architect: Gervase Wheeler |
1882 | Morgan Hall (Edwin Denison Morgan) First campus building to be connected to a College heating plant. It was the first dorm to have plumbing, including indoor bathrooms. Architect: J.C. Cady and Co. (N.Y.C.) |
1886 | Lasell Gymnasium (Edward Lasell ’28 and Josiah Lasell ’84) Architect: J.C. Cady and Co. (N.Y.C.) |
1893 | Thompson Scientific Laboratories Architect: Francis Allen (Allen & Collens) (designed all three and rebuilt the chemistry building). Chemistry Laboratory burned 1915, rebuilt 1916; enlarged and modernized 1941. |
1897 | Hopkins Hall (Mark Hopkins) Based on Romanesque style of Henry Hobson Richardson; memorial to Mark Hopkins (d. 1887). Cost: $87,000 Architect: Francis Allen and Kenway (Boston) |
1899 | Jesup Hall (Morgan Ketchum Jesup) Campus center, orange brick, painted yellow Architect: George Tilden Remodeled 1908 by John S. Oakman ’99 |
1902 | College Garage |
1905 | Berkshire Hall (renamed Ebenezer Fitch Hall in 1963) Architect: Francis R. Allen (Allen and Collens) |
1905 | Goodrich Hall Remodeled and named Goodrich. |
1905 | Thompson Memorial Chapel (Frederick Ferris Thompson ’56) Compare the Gothic of Goodrich Hall Architect: Francis R. Allen (Allen and Collens) Windows: The Church Decorating Company (N.Y.) |
1905 | Wood House (Hamilton B. Wood ’10) Architect: John B. Snook, Inc. (New York) |
1908 | Currier Hall (Lura Ormsbee Currier) Architect: Robins and J.S Oakman ’99 |
1908 | Clark Hall (Edward Clark ’31) (Geology) Old Clark Hall (wooden) pulled down 1886 Architect: Frank Wallis and William J. Rogers |
1909 | Spencer House (Philip Spencer) Architect: James Purdon |
1911 | Thompson Hall Infirmary (Mary Clark Thompson) Architect: Allen & Collens |
1911 | Williams Hall (Colonel Ephraim Williams) Architect: (Ralph Adams) Cram, Goodhue and Ferguson |
1911/12 | Chapin Hall (Alfred Clark Chapin) (formerly Grace Hall named after Mrs. Chapin) Cost: $259,313; cost of organ $45,800 Architect: (Ralph Adams) Cram, Goodhue and Ferguson |
1922 | Stetson Hall Library (Francis Lynde Stetson ’67) Cost: $750,000 Architect: (Ralph Adams) Cram and Ferguson |
1923 | Sage Hall (Mrs. Russell Sage) Architect: (Ralph Adams) Cram and Ferguson Gate between Williams and Sage erected 1936 |
1925 | Mears House (Brainerd Mears) Architect: (Ralph Adams) Cram and Ferguson |
1925 | Tyler House (Lt. John Cowperthwaite Tyler ’15) Architect: Andrews, Jones, Briscoe & Whitmore |
1926 | Cole Field House Architect: Densmore, LeClare and Robbins (Boston) |
1928 | Lasell Extension South of Gymnasium Architect: Densmore, LeClare and Robbins (Boston) |
1928 | Lehman Hall (Herbert Lehman ’99) Architect: (Ralph Adams) Cram and Ferguson |
1931 | Taconic House (Fort Hoosac) Architect: Grosvenor S. Wright |
1934 | Heating Plant Architect: (Ralph Adams) Cram and Ferguson |
1938 | Faculty House/Alumni Center Cost: $150,000 Architect: T.H. Ellett (N.Y.). |
1938 | Squash Courts Architect: Shreve, Lamb ’04 and Harmon |
1941 | Adams Memorial Theatre (John Quincy Adams) Cost: approx. $250,000 Architect: Hoyle (Cram and Ferguson) Tech. Advisor: Stanley McCandless (Yale School of Drama) |
1941 | Alumni House/The Log Architect: Kenneth Reynolds ’16 |
1946 | Faculty Housing Project (Stetson Road Apartments-12) Architect: Kenneth Reynolds ’16 |
1949-51 | Thompson Physics and Biology Laboratory Additions: $900,000 Architect: Des Granges and Steffian |
1951 | Weston Field House Cost: $17,500 Designed by: Peter P. Welanetz, P.E. |
1952 | Alumni House West College room addition: $28,000 Architect: Kenneth Reynolds ’16 |
1952 | Griffin Hall Restored: $29,000 Designed by: Peter P. Welanetz |
1952 | West College Rebuilt: $225,000 (Fire 1/2/51) Architect: Perry, Shaw, Hepburn, Kehoe and Dean |
1953 | Baxter Hall (James Phinney Baxter III ’14) Cost: $1,500,000 Architect: Perry, Shaw, Hepburn, Kehoe and Dean |
1953 | Heating Plant Addition: $300,000 Architect: Lockwood Greene Co. |
1953 | Lansing Chapman Rink and Machinery Building (William Lansing Chapman ’10) Cost: $100,000Architect: Mollenburg and Betz |
1953 | Weston Field Press Box built: $1,000 Designed by: Peter P. Welanetz, P.E. |
1954 | President’s House Garage: $6,000 Designed by: Peter P. Welanetz, P.E. |
1954/57 | Currier Hall Restoration and Music Department: $35,000 Designed by: Peter P. Welanetz, P.E. |
1955 | Baxter Hall – Rathskeller Basement of Baxter Hall: $18,250 Designed by: Perry, Shaw, Hepburn, Kehoe and Dean & William C. Bryant |
1955 | Taconic Golf Club House Cost: $70,000 Architect: Seymour Saltus |
1956 | East College Rebuilt: $267,000 Architect: Cram and Ferguson |
1956 | Mather House (Benjamin F. Mather) Restored: $37,000 Architects: William Gass and Peter P. Welanetz, P.E. |
1956 | Stetson Hall Library Addition: $450,000 Architect: Cram and Ferguson |
1957 | Conversion of Electrical Distribution System Conversion from 2300 to 4140 volts: $11,800 Designed by: Northern Berkshire Electric Co. |
1957 | Fayerweather Hall (Daniel F. Fayerweather) Rebuilt: $325,000 Architect: Cram and Ferguson |
1958-61 | Thompson Chemistry Building Alterations: $75,000 Designed by: A. B. Stanley and Peter P. Welanetz, P.E. |
1961 | Brooks House (Belvidere Brooks ’10) Architect: Daniel O’Connell & Sons |
1961 | Lansing Chapman Hockey Rink Canopy: $176,500 Architect: Lockwood Greene Co. |
1961 | Thompson Physics Library Expansion: $12,000 |
1962 | Hopkins Observatory (Albert Hopkins) Moving of Observatory: $50,000 |
1962 | New Planetarium – Hopkins Observatory Cost: $25,000 Designed by: Spitz Laboratories |
1962 | Prospect House (Prospect Mountain) Cost: $1,200,000 Architect: Shepley, Bulfinch, Richardson and Abbott |
1962 | Service Building Cost: $200,000 Architects: William Kirby and Peter P. Welanetz, P.E. |
1962 | Stetson Hall – Roper Center Addition to Stetson Library: $200,000 Architect: Hoyle, Doran and Berry |
1962 | Taconic Golf Club Club House Addition: $55,000 Designed by: Peter P. Welanetz, P.E. |
1963 | Driscoll Dining Hall (Alfred E. Driscoll ’25) Berkshire Quadrangle – dining/lounge building: $385,000 Architect: Shepley, Bulfinch, Richardson and Abbott |
1963 | Fitch House (formerly Berkshire Hall) Restored: $180,000 Architect: The Architects Collaborative |
1964 | Currier Hall Renovation: $180,000 Architect: The Architects Collaborative |
1964 | Thompson Chemistry Laboratory Laboratory Remodeling: $75,000 Architect: William Kirby, Jr. |
1964-65 | Replacement and Extension of Steam Distribution System Cost: $129,000 Engineer: Lockwood Greene Co. |
1964-65 | Thompson Memorial Chapel Exterior major restoration |
1965 | Greylock Residential Houses Design and Construction: $2,700,000 William Cullen Bryant, Franklin Carter, Washington Gladden, Mark Hopkins and Greylock Dining Architect: The Architects Collaborative |
1965 | Karl E. Weston Language Lab (Karl Ephraim Weston ’96) Alteration to former Phi Delta Theta Fraternity House Designed by: Ralph W. Iacuessa |
1968 | Bronfman Science Center (Edgar M. Bronfman ’50) Design and Construction : $3,750,000 Architect: Benjamin Thompson & Associates, Inc. |
1968 | Fernald House (Orlando Marcellus Fernald) Addition: $6,200 Designed by: Ralph W. Iacuessa |
1969 | Clark Hall Renovation: $350,000 Architect: Lockwood Greene Co. |
1969 | Lansing Chapman Rink Total enclosure and connecting building: $900,000 Engineer: Lockwood Greene Co. |
1969 | Sprinkler System Agard, Bascom, Brooks, Fort Hoosac, Perry, Spencer, Tyler, Wood: $160,000 Engineer: Automatic Sprinkler Corp. |
1969 | Taconic Golf Club Alteration: $35,000 Architect: William Kirby, Jr. |
1970 | Heating Plant Addition and alteration (oil storage facility): $615,000 Engineer/Architect: Lockwood Greene Co. |
1970 | Lasell Gym – Women’s Athletic Facility Design and Construction: $125,000 Architect: Lockwood Greene Co. |
1970 | John A. Shaw Boathouse Architect: Jonathan Rose ’63 |
1970 | Herbert S. Towne Field House (Herbert S. Towne ’21) Design and Construction : $1,000,000 Engineer: Lockwood Greene Co. |
1971 | Baxter Hall – Radio Station – WCFM |
1971 | Mission Park Residential Houses (Samuel John Mills 1809; Samuel Chapman Armstrong 1862; James Bissett Pratt 1898; Tyler Dennett 1904) Design and Construction: $5,415,000 Architect: Mitchell-Giurgola Associates |
1972 | Dodd Annex (formerly Williams Inn) Williams Inn Annex #3: $39,000 Designed by: Peter P. Welanetz, P.E. |
1972 | Morgan Hall Renovation: $759,000 Architect: Winthrop M. Wassenar, P.E. |
1972 | Tyler Annex Cost: $532,000 Architect: Unitec Inc. and Gary Lindstrom and Associates |
1973 | Chaffee Tennis House (Clarence Chaffee) Design and Construction: $13,000 Designed by: Peter P. Welanetz, P.E. |
1975 | Sawyer Library (John Edward Sawyer ’39) Design and Constructioni : $4,916,000 Architect: Harry Weese and Associates |
1976 | Service Building Storage building: $17,000 Fabricator: Agway Inc. |
1976-77 | Stetson Hall Renovation: $744,000 Architect: Harry Weese and Associates |
1977 | Chapin Hall Renovation Phase I: $400,000 Architect: Cambridge Seven Associates, Inc. |
1978 | Bernhard Music Center (Arnold Bernhard ’25) Brooks-Rogers Recital Hall (Mrs. Belvidere Brooks and Alan Rogers ’09) Presser Choral Hall (Theodore Presser) Phase II: $2,300,000 Architect: Cambridge Seven Associates, Inc. |
1978 | Garfield House (Henry Augustus Garfield 1885) Renovation: $501,000 Architect: Gary Lindstrom and Associates |
1979 | Fire Protection Safety Systems Cost: $104,750 |
1982 | Herbert S. Towne Field House Storage Addition: $35,670 Architect: David J. Westall, R.A. |
1983 | Adams Memorial Theatre Down stage addition: $937,000 Architect: Cambridge Seven Associates, Inc. |
1983 | Dimension Phone System Purchase and installation: $42,000 |
1983 | Faculty House/Alumni Center Addition: $1,245,000 Architect: Cambridge Seven Associates, Inc. |
1983 | Lawrence Hall – Williams College Museum of Art Phase I: $4,980,000 Architect: Moore, Grover and Harper |
1984 | Baxter Hall Phase I: $916,000 Architect: John Jordan, P.A. |
1984 | Heating Plant Economizer: $127,700 Engineer: Pope Engineers |
1984 | Jesup Hall (Morris Ketchum Jesup) Computer Center: $1,960,500 Architect: John Jordan, P.A. |
1984 | Mather House Admissions Office Renovation: $114,500 Architect: David J. Westall, R.A. |
1984 | Mears House Alumni/Development Offices: $477,300 Architect: John Jordan, P.A. |
1984 | Spring Street Parking Lot: $173,350Architect: William Kirby, Jr. |
1984 | Stetson Hall – Roper Center Career Counseling: $113,000 Architect: John Jordan, P.A. |
1984 | Thompson Chemistry Lab Lab renovations – lower level west: $189,480 |
1984 | Weston Field Press Box Replacement: $95,000 Architect: David J. Westall, R.A. |
1985 | Baxter Hall Phase II: $515,000 Architect: John Jordan, P.A. |
1985 | Bronfman Science Center Basement Classrooms: $501,000 Architect: Hallock Architects, Inc. |
1985 | Chandler Commercial Building (John Wesley Chandler) Retail/office building: $700,000 Architect: Cambridge Seven Associates, Inc. |
1985 | Faculty Art Studio/College Garage Renovation: $330,000 Architect: Burr and McCallum Architects |
1985 | President’s House Renovation: $170,300 |
1985 | Service Building Garage: $257,000 Architect: David J. Westall, R.A. |
1985 | Taconic Golf Club Addition – Women’s Locker Room: $200,000 Architect: William Kirby, Jr. |
1985 | Mary Clark Thompson Center for Health Services Cost: $721,000 Architect: David J. Westall, R.A. |
1985 | Thompson Physics Lab Renovation: $895,500 Architect: Hallock Architects, Inc. |
1985 | Williams Oxford Improvements: $607,000 Architect: The Oxford Architects Partnership |
1986 | Cole Field House Renovation: $105,000 Architect: David J. Westall, R.A. |
1986 | Lawrence Hall – Williams College Museum of Art Phase II: $2,571,500 Architect: Centerbrook Architects, Inc. |
1986 | Thompson Hall Conversion to Dorm: $377,000 Architect: Hallock Architects, Inc. |
1986 | Williams Club, New York Cost: $520,500 |
1987 | John Wesley Chandler Athletic Facility and Lasell Renovations Feasibility Study: $35,000 Design and Construction : $16,282,000 Retail Space/Athletic Offices: $700,000 Architect: Cambridge Seven Associates, Inc. General Contractor: Fontaine Brothers |
1987 | Mears West Renovated for Alumni Office expansion: $556,400 Architect: John Jordan, P.A. |
1987 | Weston Field New Plansky Track (Tony Plansky) and relocate baseball field: $1,243,100Architect: Saratoga Associates |
1987-92 | Thompson Biology Lab 1987-88 Lab Renovation – Phase I: $273,985 1988-89 Lab Renovation – Phase II: $204,680 1988-89 Lab Renovation – Phase III: $ 70,150 1991-92 Lab Renovation – Phase IV: $ 64,226 |
1988 | Grundy’s Garage Purchased: $445,000 |
1988 | Lasell Gym Renovation: $3,000,000 Architect: Cambridge Seven Associates, Inc. |
1989 | Clark Hall (Edward Clark 1831) Geology Lab Renovation: $117,913 |
1989 | Fayerweather Hall Renovation: $400,000 |
1989 | Heating Plant Co-generation: $340,900 Architect: vanZelm, Heywood, & Shadford |
1989 | Hopkins Hall Renovations and new addition: $9,300,000 Architect: Architectural Resources Cambridge, Inc. General Contractor: Barry Bette and Led Duke |
1989 | Weston Language Center Phases I-IV: $1,037,125 Architect: William Kirby, Jr. & David J. Westall, R.A. |
1990 | Computer Network Equipment Cost: $2,665,050 |
1990 | Jenness House (Arthur Freeman Jenness) Multicultural Center Cost: $27,300 |
1990 | Jewish Religious Center Design and Construction: $1,457,450 Architect: Herbert Newman Associates AIA, P.C. General Contractor: GSS Construction |
1990-91 | Mission Park Renovations – Phases I-III: $2,885,000 |
1991 | East College Renovation: $330,412 |
1991 | Sawyer Library Automation Cost: $650,000 |
1991 | Pine Cobble Faculty Housing Subdivision Cost: $7,612,000 |
1991 | Williams Oxford Renovation: $75,000 |
1992 | Danforth Block Renovation: $815,798 |
1992 | Morgan Hall Renovations: $1,572,568 Architect: Weese Langley Weese |
1993 | Currier Hall Renovation and refurbishment: $685,082 |
1993 | Dodd House (Cyrus Morris Dodd 1855) Renovation and refurbishment: $886,702 |
1993 | Poker Flats (formerly Stetson Road Apartments) Conversion to student housing: $1,600,000 Architect: Einhorn Yaffee Prescott |
1993 | Sawyer/Hopkins Hall Air Conditioning: $745,942 |
1993 | Sawyer Library Renovation: $3,200,000 Architect: Weese Langley Weese |
1994 | Bascom House (John Bascom 1849) Renovation: $537,846 |
1994 | Fitch House (Ebenezer Fitch) Renovation: $944,270 |
1994 | Perry House (Arthur Latham Perry 1852) Renovation: $968,874 |
1994 | Spencer House (Philip Spencer) Renovation: $845,046 Architect: EDM |
1995 | Kellogg House – Center for Environmental Studies (Ebenezer Kellogg) Matt Cole Library addition: $350,729 Architect: Ann Beha Associates |
1996 | Center for Development Economics Renovation: $1,239,862 |
1996 | Goodrich House (Frank Goodrich) Renovation: $141,168 Architect: Christopher Williams |
1996 | WLS Spencer Studio Art Building (Wadsworth Littleford Stegeman) Design and Construction: $5,606,660 Architect: Carlos Jiminez Associates/Cambridge Seven Associates |
1996 | Williams Hall/Sage Hall Renovation: $9,797,306 Architect: Einhorn Yaffee Prescott General Contractor: Barry Bette and Led Duke |
1997 | Cole Field House Renovation: $1,727,923 Additional Funding: $247,000 Architect: Baron & Hammer |
1997 | Droppers House (Garrett Droppers) Renovation/Addition: $52,071 Architect: Christopher Williams |
1997 | Griffin Hall Phases I-III: $2,750,000 Architect: Childs Bertman Tseckares |
1997 | Simon Squash Courts (Carol Girard and Cynthia Stewart Simon Squash Center) Renovation: $3,800,000 Architect: Wurmfeld Associates |
1997 | Susan Hopkins House (Susan Sedgwick Hopkins) Renovation: $160,094 Additional Funding: $67,000 |
1997 | Woodbridge House Renovation: $244,940 Additional Funding: $117,000 |
1998 | Clarence Chaffee Tennis House Torrence M. Hunt ’44 Tournament Courts Rebuilt tennis house and court improvements: $279,668 Todd Hunt Tennis Center: $167,694 Architect: Christopher Williams |
1998 | Doughty House (William H. Doughty Jr. 1898) Renovation and refurbishment: $362,973 |
1998 | Mears House Renovation/AC: $220,339 |
1998 | Seeley House (Charles F. Seeley) Restoration: $54,563 |
1998 | Thompson Hall Dorm Renovation: $1,121,774 Architect: Thomas Bartels |
1999 | Class of 1937 House/Children’s Center Renovation: $395,187 Architect: Dignard Architectural Services |
1999 | East/Fayerweather Single Sex Bathrooms: $532,462 Architect: H.P. Rovinelli Architects |
1999 | Fernald House Renovation/Code Issues: $209,665 |
1999 | Ft. Hoosac Renovation Renovation: $167,222 Architect: Bob Holdridge |
1999 | Goodrich Hall Conversion to Student Activity Center: $2,430,251 Architect: Bruner/Cott Associates Refurbish and install Tenney Window: $12,150 Cummings Studios |
1999 | Greylock Housing Code Deficiencies and Network Cabling: $244,000 |
1999 | Mt. Hope/Elm Tree House Renovation/Code Work: $538,966 Architect: Einhorn Yaffee Prescott |
1999 | Tyler House-Phase I Renovation: $50,000 |
1999 | West College Renovation: $850,074 Architect: Primary Group |
1999 | Wood House (Hamilton B. Wood ’10) Renovation: $1,047,897 Architect: Primary Group |
2000 | Brooks House Renovation: $933,559 Architect: Thomas Bartels |
2000 | Garfield House Renovation: $313,515 Architect: Thomas Bartels |
2000 | Greylock Housing-Bryant/Mark Hopkins Renovation: $2,500,000 Architect: Black River Design Contractor: MLB |
2000 | Lambert House (Anna Elizabeth Lambert) Renovation: $105,862 Architect: Mollenburg and Betz |
2000 | Milham House (Willis I. Milham 1894) Renovation: $244,611 |
2000 | Weston Field Grandstand Relocation and Renovation: $254,745 Architect: Christopher Williams |
2001 | The Carl W. Vogt ’58 House (formerly 63 Park Street) Renovation: $1,594,717 Sitework: $150,000 Architect: Mark Hammer |
2001 | American Legion New Construction: $791,205 Architect: Hill Architects |
2001 | Chaffee Tennis House Todd Hunt Tennis Center Construction of Additional Courts: $167,694 |
2001 | Dodd Dining Renovation Renovation: $1,045,705 Architect: Centerline General Contractor: Cutler |
2001 | Greylock Housing-Carter/Gladden Renovation: $3,268,596 Architect: Black River Design Contractor: MLB |
2001 | Heating Plant Upgrade Upgrade: $969,859 |
2001 | Hubbell House (Mary Hubbell) Renovation: $276,543 Architect: David Westall General Contractor: Renau |
2001 | Parsons House (Eben B. Parsons 1859) Renovation: $245,827 Architect: David Westall |
2001 | Tyler Annex Renovation Renovation: $966,457 Architect and General Contractor: Breadloaf |
2001 | Tyler House Renovation-Phase II Renovation: $1,282,174 Architect and General Contractor: Breadloaf |
2001 | Morley Science Laboratories and Schow Science Library Edward William Morley/Nan and Howard Schow Science Library and Thompson Labs Renovations: $47,827,700 Architect: Einhorn Yaffee Prescott/Zimmer Gunsul Frasca General Contractor: Gilbane Building Company |
2002 | Alumni House/The Log Renovation Renovation: $104,874 Architect: David Westall General Contractor: Renau |
2002 | Heating Plant Upgrade Boiler 3 Replacement: $3,300,000Electrical Cogeneration: $2,700,000 Auxiliary Systems: $693,889 Architect: Childs Bertman Tseckares General Contractor: Pizzagalli |
2002 | Mather House Relocation to Stetson Court and Renovation: $497,187 Architect: Thomas Bartels General Contractor: Renau |
2002 | Mission Park Dining Renovation Phase I Renovation: $3,061,876 Architect: Centerline General Contractor: Breadloaf |
2002 | Thompson Hall Student Parking Lot Design and Construction: $300,339 Architect: Halvorson |
2003 | Bascom House Renovation Conversion to Admissions: $408,622 Architect: EDM General Contractor: Renau |
2003 | Brooks B Parking Lot Expansion Expansion: $166,604 Engineer: Vince Guntlow Contractor: Petricca |
2003 | Lansing Chapman Rink Renovation Renovation: $922,021 Dasher Boards: $167,938 Engineer: RFS Contractor: American Refrigeration |
2003 | MSL Neuroscience Lab 022 Animal Lab Conversion: $254,012 Paul Solomon’s Office: $19,394 Architect: Einhorn Yaffee Prescott General Contractor: Tierney |
2003 | Parking Garage Design: $400,000 Sitework and Construction: $5,393,158 Architect: William Rawn Associates General Contractor: Barr & Barr |
2003-04 | High Voltage Distribution System Expansion Expansion: $349,974 Electrical System Repairs: $775,000 Engineering Consultant: vanZelm, Heywood and Shadford General Contractor: Pizzagalli |
2003-04 | Mission Park Renovation Phase II Student Life Improvements: $1,835,376 Network Upgrade: $650,000 Life Safety and ADA: $3,283,919 Architect: Centerline General Contractor: Breadloaf |
2003-04 | 33 Tenison Road, Cambridge, England Purchase and Renovation: $1,142,155 |
2004 | Baxter Hall Demolished 10/2004 |
2004 | Central Chilled Water Plant Planning, Site Work and Preliminary Design: $250,000 Construction: $4,180,587 Architect: William Rawn Associates General Contractor: Barr & Barr |
2004 | Chadbourne House Renovation (Paul Ansel Chadbourne) Design: $50,000 Renovation: $497,798 Architect: EDM General Contractor: Renau |
2004 | Renzie Lamb Synthetic Turf Field Cost: $1,993,460 Architect/General Contractor: Clark Companies |
2004 | New Baseball Field-Cole Field Bobby Coombs Baseball Field: $510,814 |
2004 | North Campus Utilities Phase I Cost: $3,500,000 Chilled Water to Chapin: $350,000 Engineer: VanZelm Heywood & Shadford General Contractor: Breadloaf |
2004 | Southworth School Renovation Acquisition: $400,000 Design and Conversion: $5,504,500 Architect: Black River Design General Contractor: Engelberth |
2004-2012 | Stetson/Sawyer Project Programming: $1,000,000 Design: $2,000,000 Design: $2,000,000 Design Completion and Construction: $123,000,000 Architect: Bohlin Cywinski Jackson General Contractor: Barr & Barr |
2004 | Thompson Memorial Chapel Centennial Celebration Restoration – $414,424 Windows-Lead Replacement – $106,619 Architect: Ryan-Biggs General Contractor: Allegrone |
2004-05 | Prospect House Renovation Phase I and II Student Life Improvements: $1,953,089 Renovation: $3,473,180 Radio Station: $423,390 Architect: Black River Design General Contractor: MLB |
2005 | AMT Renovation Improvements: $1,762,027Renovation: $3,200,173 Architect: William Rawn Associates General Contractor: Barr & Barr |
2005 | B&L Building Acquisition: $300,000 Design, Demolition and Construction: $3,401,104 Additional Funding: $670,000 Architect: Burr & McCallum General Contractor: Tierney |
2005 | Class of ’62 Center for Theatre and Dance Project Cost: $52,194,310 Design and Construction: 50,300,000 Additional funding: $1,500,000 Theater Consultant: Robert Davis, Inc. Architect: William Rawn Associates General Contractor: Barr & Barr |
2005 | Eph’s Monument and Gravesite Restoration Restoration: $323,487 Architect: Elmore Design General Contractor: E.T. O’Connor |
2006 | Agard Renovation Design: $100,000 Renovation: $1,899,349 Architect: Woodward, Connor, Gillies , Seleman General Contractor: Renau |
2006 | Fernald House Demolished 9/12/06 |
2006 | North Campus Utilities Phase II Cost: $2,777,039 Engineer: VanZelm, Heywood and Shadford General Contractor: Barr & Barr |
2006 | Morgan Hall Renovation Design: $200,000 Construction: $6,089,058 Architect: Black River Design General Contractor: Barr & Barr |
2006 | Wireless Implementation: $572,427 |
2007 | Children’s Center Expansion Feasibility Analysis: $34,992 Site Selection: $75,000 Design: $370,575 Design and Construction: $5,775,000 Architect: D.W. Arthur Associates Architects Contractor: Engleberth |
2007 | Fitch House Cornice Repair Design: $60,000 Construction: $1,109,000 Architect: MCWB/Ryan-Biggs General Contractor: Allegrone |
2007 | Paresky Center (David Paresky ’60 and Linda Paresky) Programming and Pre-design: $1,000,000 Design Consultants: $2,500,000 Construction: $35,200,000 Contaminated Soil Clean-Up: Additional Funding – $8,500,000 Architect: The Polshek Partnership General Contractor: Breadloaf |
2008 | Athletic Complex Master Planning: $200,000 |
2008 | Garfield Renovation design: $200,000 |
2008 | Goodrich Hall Great Hall Structural Repair: $400,000 |
2008 | Kellogg House Relocation and Renovation |
2007-08 | Off-Site Storage Building Simonds Road Property Purchase and Development: $2,350,000 General Contractor: Barr & Barr |
2008-09 | Weston Field Improvements Design and Construction: $17,600,000 Architect: Moser Pilon Nelson/Clark Companies General Contractor: Daniel O’Connell’s Sons, Inc. |
2008 | Weston Language Center Renovation |