1905 Compare the Gothic of Goodrich Hall
Architect: Francis R. Allen (Allen and Collens)
Windows: The Church Decorating Company (New York)
1954 Chapel parking lot
Architect: Olmsted Associates
1964-65 Chapel exterior major restoration
1978 Basement kitchen – $3,500
1979 Basement schematics – $2,500
1982 Hallway paint and light – $4,280
1983 Stained glass window repair – $18,000
1985 Chapel wall masonry repair – $65,000
1986 Wall rebuilt – $40,000
1987 Asbestos removal: tunnel under hallway – $14,900
1989-90 Lower level renovation – $109,045
1991 Basement offices – $10,166
1992 Storm drain – $15,000
1996-97 Steam line – Thompson Chapel/Griffin – $295,559
1997 Energy conservation including Chapel lighting – $25,000
1997 Chapel bells – $21,000
1998 Newman Association – $16,400
2000-01 Lighting/plaques/design – $275,000
2004 Centennial Celebration
Restore and clean masonry – $414,424
Architect: Ryan-Biggs
General Contractor: Allegrone
2004 Windows – lead replacement – $106,619
2005 Masonry Inspection – $56,178
2005 I&I investigation – $3,000
2006 Install hard-wired card access entry system – $2,781
2006 Install indirect lighting in Catholic space – $7,173
2006 Install new lighting in Newman Chapel – $4,500
2006 O’Connell room-fluorescent lighting replacement – $10,000
2006 Purchase miscellaneous furniture – $7,240
2006 Sidewalks repairs – Griffin/Chapel – $128,501
2008 Replace dimmer system – $45,000