Properties

Actual property book

Grundy’s Garage

1987 Basement: 2 faculty art studios 1988 Purchased – $445,000 1988-89 Bookstore – $165,945 1990-91 1914 Library – $33,840 Move 1914 Library to rear of bookstore; install wiring, lighting, heating, entrance ramps, and interior partitions. Architect: David J. Westall, R.A. and Cheryl Meyers 2002… Continue reading »

Griffin Hall – 1828 (Edward Dorr Griffin)

1828 Originally had double entrance and stood near Main Street. Built by President Griffin at a cost of $6,000; served as chapel until 1859 (when Goodrich Hall was built); library built 1847; and lecture room, moved to northeast in 1904 and remodeled. The building was originally called “the brick chapel,”… Continue reading »

Greylock Dining Hall (Greylock Quad) – 1965

1965 Residential houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining ) – $2,700,000 Architect: The Architects Collaborative 1982 Roof – $27,500 1982 Enclosure 1982 Greylock economizer – $54,520 1984 Classrooms, lighting and drapes – $12,000 1985 Classrooms – $7,600 1987 Carlisle ballasted roof… Continue reading »

Goodrich Hall – 1859 (John Zaccheus Goodrich)

1859 Chapel and Alumni Hall: shift to stone (local dolomite) and to Gothic Architect: Gervase Wheeler 1905 Remodeled and named Goodrich 1962 Alterations – $10,000 Designed by: Peter P. Welanetz, PE 1975 Major renovation – $5,400 1976 Goodrich/Lawrence steam line – $9,000 1976… Continue reading »

Gladden House (Greylock Quad) – 1965 (Washington Gladden)

1965 Residential houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining) – $2,700,000 Architect: The Architects Collaborative 1982 Steam line – $15,518 1985 Roof (Bryant, Carter, Mark Hopkins, Gladden, Greylock Dining) – $73,310 2001 Greylock Housing Renovation (Carter/Gladden)- $3,268,596 Architect: Black River Design Contractor: MLB… Continue reading »