96 School Street
4,200 sq. ft. temporary home of Archives and Chapin Library during construction of New Sawyer Library
28,906 sq. ft. college rental housing
About Southworth
The original Williamstown High School, the 100-year-old Southworth building was spared when the old Williamstown Elementary School was razed to build a new facility.
Major Construction History
Date | Project | Cost |
---|---|---|
2003 | Acquisition and preliminary design | $400,000 |
2002-04 | Design and conversion to faculty apartments Architect: Black River Design General Contractor: Engelberth |
$5,504,500 |